My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03567
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03567
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:51:05 PM
Creation date
10/11/2006 11:49:52 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1989
Author
USDOI
Title
1989 Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.' <br /> <br />. <br /> <br />. <br /> <br />RECEiVED <br /> <br />~UG 23 '90 <br />cOLOIW>O WATER <br />CONSERVATION <br />R(lAPr- <br /> <br /> <br />United States Department of the Interior <br /> <br />BUREAU OF RECLAMATION <br />UPPER COLORADO REGIONAL OFFICE <br />P.O. BOX 11568 <br />SALT LAKE CITY. UTAH 84147 <br /> <br />AUG 211990 <br /> <br />DIR <br />sc <br />ASC <br />F <br />, <br />1 <br />E <br /> <br />--=-ij <br />I <br />, <br /> <br />IN REPLY <br />REFER TO: <br />UC - 446 <br /> <br />To All on the Enclosed List <br /> <br />Subject: Annual Report of the Colorado River Storage Project and Participating <br />Projects for Fiscal Year 1989 (General Correspondence Repayment) <br /> <br />Enclosed are copies of the following information on the Colorado River Storage <br />Project and participating projects for fiscal year 1989: <br /> <br />Exhibit 1: Comparative Consolidated Balance Sheet <br /> <br />Exhibit 2: Income and Expense Summary showing the cost of operating and <br />maintaining the project. <br /> <br />Exhibit 3: Allocation of Federal Investment which summarizes the <br />preliminary allocation in most cases, and the final allocation in a few cases, <br />of total estimated costs for all authorized projects. <br /> <br />Exhibit 4: Historical and Projected Repayment of Authorized Reimbursable <br />Investment which reflects the principal payout on the in-service reimbursable <br />Federal investment, and shows the estimated rate of progress, year-by-year, in <br />accomplishing full repayment. <br /> <br />Sincerely, <br /> <br />&Z6c/~ <br /> <br />fOR Roland Robison <br />Regional Director <br /> <br />Enclosures 5 <br /> <br />cc: Mr. Sidney L. Mills, Area Director, Bureau of Indian Affairs, Albuquerque <br />Area Dffice, PO Box 26567, Albuquerque NM 87125-6567 (w/encls) <br /> <br />Mr. Harry Baker, Superintendent, Bureau of Indian Affairs, Uintah and Ouray <br />Agency, Fort Duchesne UT 84026 ~w/encls) <br />
The URL can be used to link to this page
Your browser does not support the video tag.