Laserfiche WebLink
<br />).. \,,. <br /> <br />o <br /> <br />~ <br />-..J <br />W <br /> <br />. <br /> <br />. <br /> <br />POWER DEMAND AND <br /> <br />"",... <br />MARKET VALUE FOR CASTS <br /> <br />· BASED ON REVIEW OF EXISTING FORECASTS <br /> <br />. PROJECTED STATEWIDE POWER DEMAND: <br />THROUGH 1995 - 3% CAGR <br />1995 - 2035 - 2.5% CAGR <br /> <br />. NEW GENERATING CAPACITY NEEDED BY 1997 <br /> <br />. PEAKING POWER NEEDS: <br />300 - 500 MW AROUND YEAR 2000 <br /> <br />. CPVC AVOIDED COST RATE USED FOR BASE LOAD : <br /> <br />$17.84 PER KW-MONTH <br /> <br />$1.54 PER KWH <br /> <br />· MARKET VALUE OF PEAKING POWER UNDEFINED <br />AT PRESENT <br /> <br />~ <br />,,~~ <br /> <br /> <br />~ <br /> <br />AIWM. 1'~' <br />