My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03523
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:52 PM
Creation date
10/11/2006 11:47:08 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.F
Description
UCRBRIP
Basin
Colorado Mainstem
Date
1/1/1990
Author
Lee Mills USFWS
Title
Plan for the Propagation of Threatened and Endangered Fishes of the Upper Colorado River Basin
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />THREE-YEAR OBJECTIVES <br /> <br />Following are 'the objectives for Calendar years 1988 through 1991. They are <br /> <br /> <br />arranged in sequence and followed with specific tasks, timeframes, and <br /> <br /> <br />discussions. <br /> <br />Objective 1 <br /> <br />Establish an ad hoc group of experts under the technical work group of the <br /> <br /> <br />Implementation Committee to provide direction and oversight to the propagation <br /> <br /> <br />program. This group would provide oversight and direction including assessment <br /> <br /> <br />of fish needs, development of genetic resource management plan, engineering <br /> <br /> <br />assessments and evaluations, and overall long-term propagation strategies. <br /> <br />Task 1: Establish ad hoc work group and develop direction. <br /> <br />April 15, 1988 <br /> <br />Task 2: Obtain funding and hire a full-time fish culture expert within the Fish <br /> <br /> <br />and Wildlife Service to plan, develop, and manage the propagation <br /> <br /> <br />effort. <br /> <br />July 15, 1988 <br /> <br />Task 3: Expand and update this 3-year propagation plan, taking into <br /> <br /> <br />consideration the direction developed by the ad hoc group. <br />
The URL can be used to link to this page
Your browser does not support the video tag.