Laserfiche WebLink
<br />) , <br /> <br />- ;I - <br /> <br />I' <br /> <br /> Colorado Hyomin~ utah tlffi'T ?en co ~rot!!l <br /> - - <br />Constructed <md ,\11- 211.252.300 143.073,000 llS.391,700 70,991.600 543.708,600 <br />thorized (~':clu::i"l"e <br />of Hia:'lOuri !Jaf.lin <br />Pr~rll!:'l) <br />Percent. ot to t.nl 39 26 22 13 100 <br />Co~tructed ~ill:;.ril.ir'i ** <br />Banin Prozra;'! Projects -It 49.235,800 <br /> <br />it Bc~y T)run h~ll boa,l eonst."ucted at a cost. of t15,248,000. HO\'lever, it is principallJ' <br />far flood control an1 1n'1gntion in Kan:raD. <br /> <br />..."", Ke;mola!)QIl\ 1:1t!S boon constructed at a coat. of ~4. 792,000. It 10 pl'incip:.ll3' for ir- <br />r1g1rt.i,)D in ~:outh Dakota. Gf the total cost. of the niooouri Basin Tr=!'liBs1on Di- <br />vision S13,OOO,OJO has been estimated aD t.he \;yoming portion. <br /> <br />19'2.7 <br />