My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03477
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03477
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:36 PM
Creation date
10/11/2006 11:45:21 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.111
Description
Central Utah Participating Project
State
UT
Basin
Colorado Mainstem
Date
1/1/1990
Author
Central Utah WCD
Title
Construction Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />LEGAL AND LEGISLATIVE COMMITTEE <br /> <br />The Legal and Legislative Com. <br />minee recommended to the Board <br />petitions totaling 191 acre feet <br />of irrigation water under the <br />Duchesne Block #1. <br />The Committee reviewed a contract on <br />the operation and maintenance of the <br />Jordan Aqueduct System. The agreement <br />is between Salt lake County \Vater Con- <br />servancy District and the l\.'lerropolitan <br />\Vater District of Salt lake City, with the <br />Central Utah \Varer Conservancy District <br />and the United States Bureau of Recla. <br />marion as approving parries. <br />The Committee approved the allot- <br />ment of 1.5 acre feet per share of Project <br />irrigation water for the 1989 irrigation <br />season in the Duchesne area. The allot- <br />ment could be increased or decreased <br />based on the conditions of the runoff and <br />water supply during the year. <br />The Committee reviewed a contract <br />\vith the Intermountain Consumer Power <br />Association to accept and convey the Dis- <br />trict's allotment of CRSP power to District <br />facilities. The District approved and <br />executed an agreement for this power <br />which became available in October of <br />1989. The Board approved a contract to <br />appoint ICPA as the District's agent for <br />purchasing of Salt Lake City area inte- <br />grated project power and approved a ser- <br />vice agreement with ICPA to accept and <br />convey the District's power allocation to <br />District facilities. <br />The Committee reviewed the Memoran- <br />dum of Understanding of the Provo River <br />flow requirements. The ?\'lemorandum <br />of Understanding is a good faith agree- <br />ment for the use and flows of the Provo <br />River until Jordanelle is completed and in <br />operation in 1994. It addresses the portion <br />of the river at a point immediately below <br /> <br />9 <br /> <br />the entrance of the Deer Creek tributary <br />into the Provo River to the Olmsted <br />Diversion Dam. <br />The Legal and Legislative Committee <br />reviewed a resolution to approve an agree- <br />ment with the United States Bureau of <br />Reclamation for conveyance of non- <br />Project water through Project facilities <br />and to enter into a third party agreement <br />to convey water supplies in Project <br />facilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.