My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03463
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03463
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:31 PM
Creation date
10/11/2006 11:45:11 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141
Description
Fryingpan-Arkansas Project
State
CO
Basin
Arkansas
Water Division
5
Date
1/1/1951
Author
Water Dev Assoc of S
Title
Frying-pan Arkansas Project Domestic Water Suplementary Irrigation Power Suply Flood Control The Dawn of a New Era in Southeastern Colorado
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />"- <br />,'t'"" <br /> <br />~'. " <br /> <br />~.':";~.-;'"- <br /> <br />" <br /> <br />175:\ <br /> <br />I <br />:: I <br />. .'...~ ' <br />:''';. <br /> <br />i <br /> <br />.'.1 <br /> <br /> <br />J: <br />. )1 <br />"1' <br />. . <br />'I <br />il <br />:~ <br />.<, <br />il <br />. .~ <br />, <br />.; <br />-1 <br />;~~;); <br />~~:A <br /> <br /> <br />I <br /> <br />SMALL INDUSTRY <br /> <br />1 <br /> <br /> <br />j <br /> <br />, <br /> <br />-80000 " <br />lilDD 0 <br />rtqoC <br /> <br />. ~ <br />."; <br /> <br />R II ~~I~ <br /> <br /> <br />" <br />'j <br /> <br />:..:~ <br />., <br />'.j <br />., <br />j <br />" <br />, <br />; <br />1 <br /> <br />EXPANDED INDUSTRY <br /> <br />-~ <br /> <br />., <br /> <br />-4,... <br /> <br />".", <br /> <br />~unicipal Supply <br />GJor 'Valley C(9owns <br /> <br /><, <br /> <br />project water. The remaining 800 acre-feet of project <br />water would be reserved for future requirements. The <br />municipal water would be lifted approximately 140 feet <br />into the existing Colorado Springs municipal supply <br /><;ystem, beginning with reservoirs located on the sOllth <br />slope of Pikes Peak, The pumped water, regulated with <br />the present supply, would generate energy in the two <br />municipally owned hydroelectric power plants of the <br />Colorado Springs system. <br /> <br />FUTURE PUEBLO NEEDS <br />In addition to providing treatment for Pueblo's pres- <br />ent supply of 21,000 acre,feet, which is diverted from the <br />Arkansas river, the Bureau's program would make avail- <br />able a supply of 5,000 acre,feet for anticipated require, <br />ments. <br />The additional water would consist of 2,000 acre- <br />feet from the existing \Vurcz ditch transmountain diver- <br />sion and 3,000 acre-feet from the Frying Pan-Arkansas <br />diversion. The WurtZ ditch is owned by the City of <br />Pueblo. Storage facilities of the reclamation project would <br />permit conservation of that water for'municipal use. <br />Pueblo's total supply of 26,000 acre,feet of water <br />would be pumped from Pueblo reservoir directly into thE': <br />projected purification plant, where the water would be <br />treated before being transferred by dual pipeline seven <br />miles to the city's diqribution system. A reservoir would <br />be constructed near the plant to provide the additional <br />stora~e capacity required to supply the city's peak de- <br />mands. <br /> <br />MUNICIPAL SUPPLY FOR VALLEY TOWNS <br />The municipal water requirements for eight valley <br />towns which have voiced a desire to participate is esti- <br />mated at 7,540 acre,feet by the year 2000. In order to <br />provide a reserve for those towns and possibly others, <br />8,000 acre,feet of project water has been allocated for <br />valley communities. <br />The eight which have expressed a desire for project <br />municipal water are Manzanola, Rocky Ford, La Junta, <br />Las Animas, Lamar, Crowley, Wiley, and Eads. The <br />water for these towns would be pumped from the Pueblo <br />reservoir to the purification plant by the same pumping <br />plant and penstock used to obtain Pueblo's water. After <br />being treated in the purification plant, the water would <br />be carried down the valley by a main trunk line. Branch <br />Jines would be constructed from the trunk to Crowley <br />and Eads. <br /> <br />REMEDY OFFERED FOR SEDIMENTATION <br />A remedy for the acute sedimentation problem af- <br />fecting irrigation in the main Arkansas valley is included <br />among the multi.purpose water conservation features of <br />tbe project. <br /> <br />., <br /> <br />\ <br /> <br />;:: <br /> <br />, <br /> <br />I <br />:'j <br />. , <br />, <br /> <br />:;,' <br /> <br />iJI <br />'1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.