Laserfiche WebLink
<br />(ft3/s) <br />25 <br />50 <br />IOU <br />125 <br />100 <br />75 <br />50 <br /> <br />PeriOd <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />o <br />o <br />~ <br />-.1 <br />-.l <br />cD <br /> <br />The minimum required release from Green Mountain Reservoir is <br />controlled by downstream, senior adjudicated water rights. Inflow to <br />Green Mountain Reservoir is released, as required, to meet these <br />downstream rights. Releases at all times are adequate for fish <br />preservation. <br /> <br />The following releases <br />State of Colorado's <br />Wildlife Service. <br /> <br />for fish rrom Lake Estes were recommended by the <br />Division of Wildlife and the Fish and <br /> <br />Minimum Releases <br /> <br />November 1 - April 15 <br />April 16 - April 30 <br />May 1 - May 15 <br />May 16 - August 15 <br />August 16 - August 31 <br />September 1 - September 15 <br />September 16 - October 31 <br /> <br />Diversion of flows from the Big Thompson River at Lake Estes for power <br />production is generally restricted to the May IS-September 15 period, <br />since runoff during the remaining period usually is much less than the <br />recommended minimum flows. Releases in excess of inflows are not <br />required. <br /> <br />26 <br />