My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03460
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03460
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:31 PM
Creation date
10/11/2006 11:44:53 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.700
Description
Colorado Big Thompson Project - Annual Operating Plans
Basin
South Platte
Water Division
1
Date
1/1/1989
Title
Annual Operating Plans - Colorado Big Thompson Project - Water Year 1989-1990
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(ft3/s) <br />25 <br />50 <br />IOU <br />125 <br />100 <br />75 <br />50 <br /> <br />PeriOd <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />o <br />o <br />~ <br />-.1 <br />-.l <br />cD <br /> <br />The minimum required release from Green Mountain Reservoir is <br />controlled by downstream, senior adjudicated water rights. Inflow to <br />Green Mountain Reservoir is released, as required, to meet these <br />downstream rights. Releases at all times are adequate for fish <br />preservation. <br /> <br />The following releases <br />State of Colorado's <br />Wildlife Service. <br /> <br />for fish rrom Lake Estes were recommended by the <br />Division of Wildlife and the Fish and <br /> <br />Minimum Releases <br /> <br />November 1 - April 15 <br />April 16 - April 30 <br />May 1 - May 15 <br />May 16 - August 15 <br />August 16 - August 31 <br />September 1 - September 15 <br />September 16 - October 31 <br /> <br />Diversion of flows from the Big Thompson River at Lake Estes for power <br />production is generally restricted to the May IS-September 15 period, <br />since runoff during the remaining period usually is much less than the <br />recommended minimum flows. Releases in excess of inflows are not <br />required. <br /> <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.