Laserfiche WebLink
<br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />o <br />C.) <br />.... <br />~ <br />-.l <br />N <br /> <br />terminal r-eser-voir- stor-age. Carter- Lake <br />95,200 acr-e-feet for- the water- year <br />17,000 acre-feet below capacity. <br /> <br />During the Mar-ch 21 through April 28 per-iod, Adams Tunnel and Olympus <br />Tunnel diversions will be minimized to accommodate the Pole Hill Canal, <br />Afterbay, and Powerplant maintenance scheduled. As runoff develops in <br />1ate Apr-i1 and May, Adams Tunnel diversions will be adjusted to <br />accommodate runoff timing on the east and west slopes. <br /> <br />storage will reach a maximum of <br />in late Mar-ch, and this is <br /> <br />Horsetooth ~eservoir is expected to reach a storage content of <br />127,800 acre-feet by the end of May, which is 28,900 acr-e-feet below the <br />maximum r-eservoir storage of 156,700 acr-e-feet. Restrictions on the <br />filling of Horsetooth Reservoir were lifted on November 27, 1989, and <br />the reservoir may now be oper-ated to the design maximum water- surface <br />elevation of 5430.00 feet (156,700 acre-feet). <br /> <br />Dur-ing April and June, a total of 7,600 acre-feet will be r-eleased fr-om <br />Carter- Lake to Flatir-on Reser-voir. This r-elease is necessary to meet <br />the 8ig Thompson irrigation demands and the minimum inflow to Horsetooth <br />Reservoir during the Pole Hill maintenance and when "skim" water <br />diversions are at capacity. <br /> <br />Adams Tunnel diversion will be down to 7,300 acre-feet in June to take <br />full advantage of operation "skim". Under- oper-ation "skim", <br />approximately 49,200 acre-feet of 8ig Thompson River- water- will be <br />di verted at Lake Estes through the Foothi 11 s System duri ng Apr il-September. <br />The majority of "skim" water (46,400 acre-feet) wi 11 be diver-ted during <br />May, June, and July. <br /> <br />Irrigation demands will draft Hor-setooth Reser-voir- stor-age to <br />approx imate ly 69, 700 acr-e-feet by September 30. A tota 1 of <br />10,400 acre-feet will be pumped to Car-ter- Lake from May thr-ough September <br />which wi 11 bring Carter Lake storage to near- 35,000 acre-feet. The <br />combined east slope terminal storage will be 86 per-cent of nor-mal at the <br />end of the water year. <br /> <br />19 <br />