My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03422
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03422
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:21 PM
Creation date
10/11/2006 11:43:28 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.111.O
Description
Central Utah Participating Project
State
UT
Basin
Colorado Mainstem
Date
9/9/1985
Author
US Gen. Accounting
Title
Report to the Honorable Howard M. Metzenbaum US Senate Bureau of Reclamation's Central Utah and Central Valley Projects Repayment Arrangements
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />APPENDIX I <br /> <br />APPENDIX I <br /> <br />Table I. 1 <br /> <br />Cost Allocation and Repayment <br />Bonneville unit <br /> <br />(000 omitted) <br /> <br />Cost allocation <br /> <br />1964 definite plan ~/ <br />(bureau records) <br />~ Percent <br /> <br />Bureau estimate <br />(FY 86 budget data) <br />Cost Percent <br /> <br />~,-. <br /> <br />Reimbursable: <br />Irrigation $177 ,605 54.0 $ 915,090 43.1 <br />M&I 76,268 23.2 640,882 30.2 <br />Commercial power 48,152 14.6 296,371 14.0 <br />Total $302,025 91.8 $1,852,343 87.3 <br />Nonreimbursable: <br />Fish & wildlife 20,880 167,295 <br />Flood control 3,474 5,619 <br />Recreation 2,712 61,531 <br />Highways 35,012 <br />Total $ 27,066 8.2 $ 269,457 12.7 <br />Total $329,091 100.0 $2,121,800 100.0 <br /> <br />. .-,~. <br /> <br />Repayment of <br />Reimbursable Costs <br />Irrigation costs: <br /> Water users $ 16,400 9.2 $ 16,400 1.8 <br /> ad valorem tax 38,005 21.4 0.0 <br /> Power revenues 123,200 69.4 897,928 98.1 <br /> Other 0.0 762 0.1 <br /> Total $177,605 100.0 $ 915,090 100.0 <br />z.!&I costs: <br /> Water users 57,236 75.0 455,514 71.1 <br /> ad valorem tax 19,032 25.0 175,010 27.3 <br /> Other 0.0 10,358 1.6 <br /> Total $ 76,268 100.0 $ 640,882 100.0 <br />Commercial power 48,152 100.0 296,371 100.0 <br /> Total $302,025 $1,852,343 <br />a/The definite plan report provides the bas is for the initial <br />- appropriation for construction and the repayment con tract. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.