My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03410
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:17 PM
Creation date
10/11/2006 11:43:14 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.400
Description
Platte River Basin - River Basin General Publications - Nebraska
State
NE
Basin
South Platte
Water Division
1
Date
8/1/1950
Author
BOR
Title
Braziel Dam and Reservoir - Nebraska
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />) <br /> <br />001056 <br /> <br />. <br /> <br />SCHEDUIE OF !:EE? <br /> <br />The Contractor shall pa;)' for the e18~tric service furnished <br />hereunder ~t rates, ch~rges, and upon conditio~s ~s follows: <br /> <br />. <br /> <br />(a) (I) DemWld Charge: $1.25 reI' kiJo\'l8.tt of 30-minuto <br />integrated ~ax:mum demand per month. <br />(n) Energy Charge.: First 50,000 Icilowr.tthours pol' month <br />at 10 mills por kilawatthour. <br />Ne::t 50,000 kilov:atthours per month <br />at 8 mills per Icilowatthour. <br />Hext GO, 000 ldlowatthours per month <br />at 7 mills per Icilowatthour. <br />Hext 150,000 kiloVlc.tthours per month <br />at 6 mills per lcilowQtthour. <br />Next 300,000 kilowatthours per month <br />at 5 mills per kilowatthour. <br />Allover 600,000 kilowatthours per <br />month at 4 mills per kilowc.tthour. <br />(nI) Minimum Charge: $1.25 fer month per kilowatt of the <br />contract rate of de 11 very. <br />(IV) Surcharge: The dewand charge, the energy charce <br />and the minimum charge herein <br />above provided shall each he in- <br />crec'Ged by 10 percent, by re"-,,on of <br />pov;er bein['; delivered at less than <br />t~~nnsTrlission line volto.geo <br /> <br />(h) For a fractional part of a billinG period at tho beginning <br />or end of service hereunder, the dumand chat'be, the kilowatthour <br />blocks of the energy chc.r"~e, and the ,ni.nimum chr.rge shall each be pro- <br />portio;mte ly adjusted in the ratio that tho number of hours tho.t <br />olectric service is furnished to the Contractor in such fractional <br />bi lling period bean to the total number of hours in tho bi lling <br />l1eriod involved. <br /> <br />..) <br /> <br />(c) Should the delivery of electric energy ho interrupted or <br />reduced, because of conditions on the power system of tho United <br />3tatcs, below the controct rato of delivery o~ below tho rate of <br />delivery required by the Contractor at the timo of such reduction, <br />"Ihichever is the leeser, for a period or periods of one (1) hour <br />or longor in lluro.tion each, tho total n1...unber of' hours of curtailed <br />scrvice in any billing period shall be detG~,incd by c.dding the st~ <br />of the nw,wor of hours of interru?tcd Gor~ico to the proCuct of <br />tho number of hours of reduood corvice multiplied by tho percentage <br />of said reduction boloVl s:J.id contre.ct rote of deliv8ry or below <br />tho rQte of dGlivery roquired by the Contr~ctor at the time of ouch <br />reduction, whichever is the losser. Tho demand oh~rgc, the <br />l:ilovm',thour blocks of tho energy cmlrge, and tho minimum chargo <br />Ghall each be proportionately o.djustGd in tho rc.tio that tho total <br />n'"obor of hours of ouch curt:J.ilcd service is horoin determined boars <br />to the totnl number of hoursir>. the billinl'; pm-iod i;w~J.v(;il& ~he <br /> <br />61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.