My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03410
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:17 PM
Creation date
10/11/2006 11:43:14 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.400
Description
Platte River Basin - River Basin General Publications - Nebraska
State
NE
Basin
South Platte
Water Division
1
Date
8/1/1950
Author
BOR
Title
Braziel Dam and Reservoir - Nebraska
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />there appears to be very little likelihood of renegotiating contracts to . <br />fully repDamay the $lbui,J81t2,600Fur, Wthhich wou;-~~e alloca1tulaed :~ irri~abtion }ft d . <br />Braziel were . er, pre r>.ary ca c .....ons 0.. ene...1. s an <br />their comparison with costs indioates a benefit-cost ratio of only <br />0.42:1.00. <br /> <br />In view of the repayment problem and' the laok of economic justi- <br />fioation, I conour in the reoommendation of the Regional Director that the <br />Braziel Dam and Reservoir not be authorized for construction at this time <br />ancl that this question be left open for consideration in the future, if <br />at that time the economic needs of the Nation, further information on the <br />project or other developments justifY such reoonsideration. <br /> <br />Acoordingly, I recommend that you approve and adopt the attaohed <br />report r.s your proposed report on the Braziel Dam and Reservoir,. Uebraska, <br />and that you authorize me in your behalf to obtain the oomments of the <br />States of the Platte River Basin and of U16 agenoies represented on the <br />Federal Inter-Agency River Basin Committee. Upon receipt of these comments, <br />the report will be resubmitted to you for transmittal to. the President <br />and subsequently to the Congress. <br /> <br />Respectfully, <br /> <br />/s/ Michael W. Stra.us <br />Commissioner <br /> <br />. <br /> <br />A ttachinent <br /> <br />Approved and Adopted: March 12, 1952 <br /> <br />/s/ Oscar L. Chapman <br />Secretary of the Interior <br /> <br />Interior--Dup1icating Section, WaShington, D. C. 16269 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.