Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />0010ilS <br /> <br />INVESTIGATIONS AND REPORTS <br /> <br />Previous Investigations <br /> <br />The North Platte Project Histories (Gering & Ft. Laramie <br />Irrigation District), 1919-24, describe briefly the development <br />of Dry Creek into the Dry Creek Drain and drainage system. Prac- <br />tically from the beginning of the project the need for an off stream <br />regulating reservoir has been recognized. Bureau maps of the <br />North Platte Project, published in 1909, 1920, and 1929 show a <br />potential reservoir site on Horse Creek in TIyoming. In subsequent <br />years an investigation of the Horse Creek site was made, including <br />the drilling of 14 test holes at the darnsite in 1940. This site was <br />not considered feasible, primarily because of the depth to suitable <br />foundations. <br /> <br />Present Investigation <br /> <br />The investigation on which this report is based was conducted <br />during the spring and summer months of 1947. The site on Dry <br />Creek Drain was chosen at; the alternative to the Horse Creek site <br />since it would serve the same purpose, and conditions were more <br />favorable for construction. <br /> <br />The investigation was conducted in connection with the North <br />Platte River Rehabilitatl.on Investigations, using General Investi- <br />gation funds allotted to the district under notice of allotments <br />from Region 7 headquarters dated February 17, 1947, and May 26, <br />19117. <br /> <br />Scope of Present Investigation <br /> <br />A preliminary report has been prepared on this project, The <br />damsite and reservoir area were covered by a topographic survey. <br />'t geological investigation was made, and foundations explored by test <br />pits and core drilling. Test pits and trenches were dug for the <br />purpose of sampling and detennining the extent of the borrow pits. <br />Detailed water and reservoir operation studies were made to determine <br />the capacity required for storage of waste water. The economic <br />conditions were investigated and repayment capacity estimated. <br /> <br />Acknowledgements <br /> <br />Numerous .individuals and organizations have furnished data <br />that are included in this report. <br /> <br />11 <br /> <br />(Rev.) <br />