My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03388
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03388
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:40:07 PM
Creation date
10/11/2006 11:41:38 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8041
Description
208 Clean Water Grant
State
CO
Date
3/4/1982
Author
CWCB
Title
Quarterly Reports on the 208 Clean Water Grant for the Water Quality Control Division of the Coloradio Dept of Health
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3694 <br />Moapa Valley Subevaluation unit (SCS) - Nevada <br /> <br />The Moapa Valley Subevaluation Unit, Nevada, is the first <br />part of a study of the Virgin River Unit in Arizona, Nevada, and <br />Utah. Located in:southeastern Nevada, the Muddy River flows <br />through the Moapa Valley into Lake Mead. The river contributes <br />an average of 73,400 tons of salt annually to Lake Mead. The <br />SCS Salinity Control Study, completed in February of 1981, <br />identified a potential to reduce salt loading by 19,500 tons with <br />improvements to water management systems and water delivery <br />systems. <br /> <br />The preferred alternative would improve canal, pipeline and <br />lateral systems, on-farm irrigation systems, and erosion <br />control. Off-farm delivery systems will be improved by <br />installing approximately 80,000 feet of pipeline and lining <br />another 1,400 feet. On-farm systems improvements would take the <br />form of pipeline installation and ditch lining with appurtenant <br />items for irrigation automation and water measuring. If <br />implemented, the proposal could result in ~.O mg/L reduction in <br />salt concentration at Imperial Dam at a cost of <br />$489,000 mg/L/year. <br /> <br />Implementation of the proposal will be held up indefinitely <br />pending funding clarification. <br /> <br />DRS/gl <br />12/9/81 <br /> <br />-27- <br />
The URL can be used to link to this page
Your browser does not support the video tag.