My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03378
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:05 PM
Creation date
10/11/2006 11:41:18 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.300
Description
Lower Gunnison Basin Unit - Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
4
Date
7/1/1981
Title
Lower Gunnison Basin Unit Status Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />! <br /> <br />Implementation of the proposed plan for canal lining would affect <br />the canal-side marshlands. Affected wetland vegetation would be replaced <br />by native saltbush and greasewood and the composition of the area's wild- <br />life would respond according to the change in habitat. About 612 acres <br />of wetlands would be converted to other vegetative types. About 1,935 acres <br />would be reduced in quality. <br /> <br />The proposed plan includes measures for wildlife mitigation. About <br />2,100 acres of primarily riparian wetlands along the Gunnison and Uncompahgre <br />Rivers would be purchased by the United States for habitat replacement and <br />would probably be operated by the Colorado Division of Wildlife. <br /> <br />Socioeconomic impacts of the project are expected to be minor. <br />Construction of the unit is expected to begin at about the time construc- <br />tion of the Dallas Creek Project is completed. Therefore, the adverse <br />economic impact upon the area expected at the end of construction for <br />Dallas Creek would be lessened with the beginning of construction of the <br />Lower Gunnison Basin Unit. <br /> <br />Water supplies will not be further depleted with development of the <br />recommended plan. The O&M contract will include provision for water con- <br />servation and assure that water conserved as a result of the unit devel- <br />opment will be used only on presently irrigated land in the Uncompahgre <br />Project are~ and only if its use will not add to the salinity levels of the <br />Uncompahgre River. <br /> <br />000921 <br /> <br />! <br />L <br /> <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.