Laserfiche WebLink
<br />r <br /> <br />~ <br />~ <br /> <br />~ <br /> <br />.~ <br />" <br /> <br />TABLE 10 (CONTINUED) <br /> <br />KEY DECISION POINTS AND ACTIONS <br />RELATIVE TO ANNUAL OPERATING <br />PLANS DURING FULL RESERVOIR CONDITIONS <br /> <br />Bureau of Reclamation's monthly assessment, in cooperation with <br />Work Group, of the need for April-June excess water releases to <br />provide flexibility to deal with late seasonal variation in the <br />forecasted runoff and the system recovery potential <br /> <br />~ <br />I <br /> <br />-45- <br />