My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03366
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:01 PM
Creation date
10/11/2006 11:41:06 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8442.400
Description
Drought Preparedness
State
CO
Basin
Statewide
Date
2/1/2001
Author
Various
Title
Water Supply and Utilization Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I!~~:"~? <br />- -+ _J ,~it..! <br /> <br />., <br /> <br />PROJECT WATER DELIVERIES BELOW AVERAGE <br /> <br />Project water deliveries during June were 149 percent of average. <br />Big Thompson E?easonal deliveries (November 2000 - June 2-001) were <br />of average to date. <br /> <br />Colorado- <br />98 percent <br /> <br />Units = 1000 AF <br /> <br />Project Delivery' Point June Delivery * Seasonal Delivery <br /> % of Through June 30* <br /> 2001 Avg 1/ Avg 2001 Avg 1./ % of Avg <br /> Carter Lake 10.2 6.4 159 29.3 18.8 156 <br /> Hansen F.C, 1.3 2.7 48 4.9 17.7 28 <br /> Horsetooth Res. 13.2 7.5 176 29..5 28.4 104 <br />CBT Total . 24.7 16.6 149 63.7 64.9 98 <br /> <br />* Includes Horsetooth rehabilitation water <br />!/ 30 year average, 1966-1995 <br /> <br />4 <br /> <br />-'", <br /> <br /> <br /> <br />* <br /> <br />'1 <br />z: <br /> <br />,:, <br /> <br />',1: <br /> <br />~ <br /> <br />'} <br /> <br />'I <br />,,"': <br />"ji <br />,'f <br /> <br />'; <br />1 <br />, <br /> <br />\1 <br />~ <br /> <br />,"; <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.