My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03343
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03343
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:53 PM
Creation date
10/11/2006 11:40:20 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8507
Description
Rio Grande Project
State
CO
Basin
Rio Grande
Date
1/1/1995
Title
Rio Grande Study Section 2 & 3
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />The International Diversion Dam is an enlargement of the old Mexican Diversion Dam <br />that existed on the Rio Grande prior to the development of the Rio Grande Project. It is located <br />2 miles downstream from the American Dam. At the present time, the International Dam is used <br />to divert water into the Acequia Madre for use in Mexico. Prior to the construction of the <br />American Diversion Dam, the International Dam was used to divert water into the Franklin <br />Canal. <br /> <br />The Franklin Canal transports water for the irrigation of 18,500 acres in the upper portion <br />of the EI Paso Valley. It was constructed in 1889-90 by a private irrigation company and was <br />acquired by the USBR in 1912. Parts of the Franklin Canal were enlarged in 1914. It is 30 <br />miles long and has an initial capacity of about 325 cfs. The Franklin Canal also (1) receives <br />water from the Riverside Canal through the Franklin Feeder Canal, (2) supplies the Riverside <br />Canal through the Southside Feeder Canal, and (3) supplies the Riverside and Riverside <br />Extension Canals through the Island Feeder Canal. The first 13 or 14 miles of the Franklin <br />Canal extend through portions of EI Paso that are highly urbanized. <br /> <br />The American Canal Extension Project is under construction by the American Section of <br />the IBWC and should be completed this year. It will involve more than 15 miles of concrete- <br />lined canal to allow water for the Riverside Canal to be carried through the American Canal- <br />Franklin system rather than in the river. Sections of the existing Franklin Canal are being <br />replaced and 12 miles of new canal are being constructed to make a direct connection between <br />the Franklin and Riverside Canals. IBWC has estimated that the American Canal Extension will <br />save 20,000 to 30,000 acre-feet of water that is currently lost to seepage, evaporation, and <br />transpiration. Evidently, some of the savings will occur by eliminating unauthorized Mexican <br />diversion from water intended for the Riverside Canal. <br /> <br />The Riverside Diversion Dam is located 17 miles downstream from the American <br />Diversion Dam and used to divert water into the Riverside Canal. The Riverside Diversion Dam <br />is a concrete weir with radial control gates and is the lowest project point of diversion on the Rio <br />Grande. These facilities provide water for the irrigation of up to 39,500 acres in the lower part <br />of the EI Paso Valley, and it also carries .surplus' water to the HCCRD. The Riverside Canal is <br /> <br />2 -16 <br /> <br />r - "'" .,", <br />L <br /> <br />.::-:~-.zt{.:"Jt"". <br /> <br />,;"...,,-~:t:,;Iil;rL!:.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.