Laserfiche WebLink
<br />....,..,',~,'. <br />'V"','-J',' J; <br /> <br />,,,._ ,"_<: ;^"__, ,'c",~.\,>'1;; " <br /> <br />1;;'" <br /> <br />Unit and Agency <br /> <br />. . - . <br />. '"., ..' . < <br />J;smnatesof SaliOlty ConlIOi Potentlai-'-Jaimai'Y 1986. <br /> <br />, Projected Est 88ft Annual <br />,Salt Reduction Cost <br />ReduCtion to &ite Effectiveness <br />k ton/yr k ton/yr, $/ton <br /> <br /> <br /> <br />.'fI <br /> <br /> <br />I <br />.,. <br /> <br />Status <br /> <br />Palo Verde Irrig Dist CA, BR/USDA <br />Sinbad Valley CO, BLM <br />Meeker Dome CO, BR <br />Grand Valley, Stage One CO, BR <br />Stage Two, BR <br />Stage Two )jalance, BR <br />USDA <br />Paradox Valley CO,BR <br />Lower Gunnison Stage I WW CO, BR <br />Stage I Deferred, BR <br />North Fork, BR <br />USDA <br />Dolores Project (McE1mo) CO, BR <br />McEwoCreekCO, USDA <br />GJenwood-Dotsero Springs CO, BR <br />Mancos CO, USDA <br />Lower Virgin NV, BR <br />Virgin Valley, NV-AZ, USDA <br />Moapa Valley NV, USDA <br />Las Vegas Wash Stg I, Piitman, BR <br />Stage I, Whitney, BR <br />Stage II, BR <br />San Juan River NM, BR <br />Uinta Basin Stage One UT, BR <br />Stage Two, BR <br />USDA <br />Price-San Rafael UT, BR <br />Price-San Rafael UT, USDA <br />Dirty Devil UT, BR <br />Big Sandy River WY, BR <br />USDA <br /> <br />1/ <br />7,470 <br />19,000 <br />24,000 <br />120,300 <br />23,200 <br />230,000 <br />I80~OOO <br />74,300 <br />66,300 <br />1/ <br />335,000 <br />23,420 <br />38,000 <br />287,000 <br />8,800 <br />270,000 2/ <br />37,200 <br />19,500 <br />7,000 <br />10,000 2/, <br />66,000 2/ <br />1/ <br />25,500 <br />1/ <br />98,200 3/ <br />22,000 <br />1/ <br />20,600 <br />1/ <br />52,900 3/ <br /> <br />19,000/ <br />19,900 <br /> <br />1/ <br />101 <br />14 <br />123 <br />93 <br />297 <br />23 <br />32 <br />17 <br />183 <br />1/ <br />32 <br />89 <br />67 <br />109 <br />56 <br />69 <br />16 <br />35 <br />24 <br />16 <br />17 <br />1/ <br />85 <br />1/ <br />59 <br />47 <br />1/ <br />97 <br />1/ <br />25 <br /> <br />27,300 <br /> <br />7,000 <br /> <br />15,600 <br /> <br />Under investigation <br />Advance planning to begin 1988 <br />Completed during verif studies <br />Construction' complete <br />PreconstruCtion planning <br />,EDM <br />Under construction <br />Preconstruction planning <br />Preconstruction planning <br /> <br />Under investigation <br />Plan complete; plan to rescope <br />Preconstruction planning <br />Extended to future yrs <br />Deferred <br />Planning complete <br />Under investigation <br />Planning complete, pending funding <br />Plan complete, pending funding <br />Construction complete <br />Verification studies underway <br />Under reformulation' <br />Under investigation <br />Planning complete <br />Under co~struction <br />Under construction <br />Considering new combined alternative <br />Investigations underway <br />Planning complete <br />Reformnlation studies <br />,,' ~.d.~n,olH"!!!!,~ !iPing and <br />onf~ low pressure alternative <br /> <br />. All figures are from the 1985 Evaluation of Salimty Control Programs in the Colorado River Basin and dollars used to figure cost <br />effectiveness have been adjusted to reflect 1984 dollars and 8-3/8 percent interest. <br /> <br />1/ Studies have not progressed far enough to make estimates. <br />2/ Best estimates at .this time. <br />3/ Revised estimates that differ from published USDA reports because of ne~ information and data now available, <br /> <br />2550 <br /> <br />GPO 849 - 924 <br />