My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03331
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03331
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:49 PM
Creation date
10/11/2006 11:39:58 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.430
Description
Colorado River Basin Organizations-Entities - Gunnison - UVWUA - AB Lateral
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/1/2000
Author
DOI
Title
AB Lateral Hydropower Project - Supplemental Environmental Impact Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />n~~!~~.. . <br /> <br />Purpose and Need <br />- - J <br /> <br />1-3 <br /> <br />Water is presently diverted from the Gunnison River to the Uncompahgre River to <br />provide supplemental irrigation water for area crops. Irrigation diversions have been <br />made through the Gunnison Tunnel and South Canal for over 80 years. The Project, at <br />750-cfs design capacity, would increase the average annual diversions from the Gunnison <br />River from 368,750 to 619,270 acre-feet per year, a difference of 240,520 acre-feet <br />annually. This diversion would increase the average annual flow in the Uncompahgre <br />River by 332 cubic feet per second. The 750-cfs Project would generate an average of <br />242,215 kilowatt-hours per year (kWh) and have an installed capacity of37.1 megawatts <br />(MW). <br /> <br />Figure 1-1 shows the UVRP, its major canals, and the relationship of these canals to the <br />Gunnison and Uncompahgre Rivers. <br /> <br />1.4 Need for Project <br /> <br />The need for the Project was stated in the PElS and was based upon the following <br />considerations: <br /> <br />. Generating electrical power, particularly within the authorization of PL 75-698. <br />. Developing a renewable resource with no air emissions. <br />. Improving operation of the existing irrigation system. <br />. Providing a revenue source for capital improvements to the irrigation delivery system. <br /> <br />Updated information regarding these factors is provided in the following sections. <br /> <br /> <br />AS Lateral Hydropower Project <br /> <br />July2000 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.