Laserfiche WebLink
<br /> <br /> <br />SUMMARY <br /> <br />Table B.--Features of the NED and Project Sponsor's plans <br /> <br />Features <br /> <br />Total irrigated acres <br />Ground-water depths' <br />Average annual diversion <br />Ground-water reoharge <br />storage (acre-feet annually) <br />Wildlife storage (acre-feet) <br />Wildlife flow augmenta- <br />tion (acre-feet), <br /> <br />Main facilities <br />Wildlife reservoir <br />wildlife storage (acre-feet I <br />Recharge reservoirs <br />Recharqe storage <br />(acre-feet) <br />Recharge ponds (No.) <br />Ground-water recharge <br />(acre-feet annually) <br />Diversion dam (350 ft Is) <br />Pumping plant (250 ft'ls) <br />Open supply system (miles) <br />Closed supply system (miles) <br />Habitat management areas <br />(acres) <br /> <br />Cost of main faoilities <br />Wildlife storage reservoirs <br />Recharge storage reservoirs <br />Recharge ponds and pipe <br />laterals <br />Diversion dam <br />Pumping plant <br />Open supply system <br />Habitat management <br />O&M equipment (recharge) <br />Fish and wildlife <br />(mitigation and <br />enhancement) <br />Recreation (facilities) <br />O&M equipment (habitat) <br /> <br />Project cost (includes. <br />habitat plan, fish and <br />wildlife, and recreation) <br />(rounded) <br /> <br /> Project <br /> Sponsor's <br />NEO plan plan <br />190,800 232,800 <br />+9 +15 <br />54,400 87.700 <br />52,900 42,000 <br />30,300 22,000 <br />1 1 <br />252,000 252,000 <br />5 8 <br />58,150 107, 690 <br />24 24 <br />48,500 77 , 600 <br />1 1 <br />0 1 <br />45 72 <br />35 35 <br />14,065 14,065 <br />$173.000,000 $165,500,000 <br />62,700,000 139,576,000 <br />18.000,000 18,000,000 <br />6,100,000 6,100,000 <br />0 5,900,000 <br />46,000,000 66,710,000 <br />27,000,000 27.000,000 <br />1,800,000 4,300,000 <br />1,274,900 1,431,000 <br />4,131,000 6,311,000 <br />2,700,000 2,700,000 <br /> <br />$343.000,000 <br /> <br />$443,000,000 <br /> <br />Annual cost <br />Energy <br />Economic cost of energy2 <br />OM&R' <br />(rounded) <br /> <br />o <br />o <br />910,000 <br /> <br />35.300 <br />110,300 <br />1,211,955 <br />1,212,000 <br /> <br />1 Average qroynd-water elevation increase of the Prairie Bend Unit compared to <br />the future without condition. <br />, Used instead of P-SMB assigned cost in economic analysis. The cost is <br />computed as 22.2 mills/Kwhr minus 2.5 mills/Kwhr OM&R cost = 19.7 mills/Kwhr. <br />, Includes equipment replacement reserve using 8-7/8 percent sinking funds. <br /> <br />S-5 <br /> <br />~r <br /> <br /> <br /> <br />--.- <br />