Laserfiche WebLink
<br />Number <br /> <br />V-ll <br /> <br />V-12 <br />V-13 <br /> <br />V-14 <br />V-IS <br /> <br />V-16 <br /> <br />V-l? <br /> <br />V-18 <br /> <br />V-19 <br /> <br />V-20 <br /> <br />V-21 <br /> <br />V-22 <br /> <br />V-23 <br /> <br />V-24 <br /> <br />V-25 <br /> <br />TABLES (continued) <br /> <br />Summary of Human Use and Economic <br />Evaluation of the NED Plan , , , , . , , , <br />Habitat Losses of Three Major Cover <br />Types Due to Inundation . . , .' . , , . . <br />Net Change in Average Annual Habitat Units <br />Without the Project Compared to With the <br />NED Plan Including Mitigation Features , , <br />Estimated Fish and wildlife Mitigation and <br />Annual OM&R Costs for the NED Plan . , , <br />Number of Consecutive Days Greater Than <br />B,OOO Ft3/s at Overton and Grand Island, <br />Project Sponsor's Plan. . , , . , . , . , , <br />Potential Annual Rate of Pesticides Leaching <br />Past the Root Zone , . . . , , , , , . . , , <br />Net Change in AAHU's With the Project <br />Sponsor's Plan Compared to Without <br />Project Conditions , ., . . , . . . . . . , . . . <br />Months Instream Flows Were Met at OVerton, <br />Future Without Condition (PB-2) - Project <br />Sponsor's Plan (PB8B) ..",."".. <br />Months Instream Flows Were Met at Grand Island <br />Future Without Condition (BP-2) - Project <br />Sponsor's Plan (PB8A) ..""""" <br />Changes in Flow and Whooping Crane. Roosting <br />Habitat for April Resulting From the <br />Prairie Bend Unit Project Sponsor's Plan, <br />Changes in Flow and Whooping Crane Roosting <br />Habitat for October Resulting From the <br />Prairie Bend Unit Project Sponsor's Plan, <br />Comparison of the Number of Junes, Julys, <br />and Augusts in 30-Year Period (1951-1980) by <br />Individual Month and by 30-Month Period in <br />Which 800 Ft3/s Requirement for Least Tern <br />and Piping Plover Nesting and Forage Fish <br />Is Present at Overton and Grand Island for <br />Future Without Conditions and Project <br />Sponsor':3 Plan . . . . . . . . . . . . . . . . . <br />Number of Months in the 30-Year Period <br />(1951-1980) in Which the 1,100 Ft3/s <br />Requirement for Bald Eagle Feeding is Met <br />or Exceeded at Overton for Project <br />Sponsor's Plan. . . I . . . . . . . . . . <br />Change in Acres of Total Wetted Area by Month <br />for 30-Year Period of Record for 89 Miles <br />of Platte River From Johnson-2 to Chapman for <br />Future Without and for the Project Sponsor's <br /> <br />Plan. . . I . . I . . I I . . . , . . . . . . <br /> <br />. . <br /> <br />Summary of Human Use and Economic Evaluation <br />of Stages 1 and 2 Construction of the Project <br />Sponsor's Plan. . . . . . . . . . . . . <br /> <br />xiv <br /> <br />Page <br /> <br />V-57 <br /> <br />V-68 <br /> <br />V-69 <br /> <br />V-71 <br /> <br />V-85 <br /> <br />V-88 <br /> <br />V-89 <br /> <br />V-93 <br /> <br />V-94 <br /> <br />V-I00 <br /> <br />V-I0l <br /> <br />V-104 <br /> <br />V-ll1 <br /> <br />V-ll 7 <br /> <br />V-122 <br /> <br />