My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03313
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:42 PM
Creation date
10/11/2006 11:39:27 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8112.600
Description
Arkansas White Red Basins Interagency Committee - AWRBIAC
Basin
Arkansas
Water Division
2
Date
3/1/1982
Title
Arkansas-White-Red Basins Water Resources Activities Report --- Part 2 of 2 -- Page 142 - end maps
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-; <br /> <br />. <br /> <br />o <br />r::) <br />.... <br />.;:.. <br />...J <br />l-" <br /> <br />~ <br /><J1 <br />Z <br />U! <br />0.' <br />X <br />U! <br /> <br />z <br />"' <br />:; <br />Z <br />0: <br /> <br />. <br /> <br />V <br /> <br />'" <br /> <br />co <br />w <br />'-' <br />:J <br />o <br />o <br />0: <br />0. <br />W <br />X <br /> <br />.. <br /> <br />Corps of Engineers <br />Revised July 1984 <br /> <br />41, Denison Dam (Lake Texoma), OK & TX <br />STATUS: The survey report was reviewed by Southwestern Division and returned <br />to Tulsa District in August 1983 for revision. Revisions are awaiting action <br />on proposed legislation to reallocate up to an additional 300,000 ac - ft of <br />hydropower storage to water supply and receipt of additional study funds. <br /> <br />DESCRIPTION: (Tn) Survey-scope study to determine whether it would be <br />advisable to modify the existing Denison Dam (Lake Texoma) project to include <br />recreation, irrigation, water quality control, municipal and industrial water <br />supply, and other purposes, in addition to the authorized purposes for which <br />it is being operated and maintained. <br /> <br />SPONSOR: Oklahoma Water Resources Board and city of Sherman, Texas. <br /> <br />47, Red River and Tributaries above Denison Dam, OK & TX <br />STATUS: Plan of survey has been completed. Ini tial public hearings were <br />held in Childress, Texas and Lawton, Oklahoma, on 5 November and 3 December <br />1969. After a 2-year lapse in funding, a reconnaissance study on the Pease <br />River was completed in November 1980. Further study of the Pease River has <br />been deferred because of a lack of economic justification. Reconnaissance <br />reports on the North Fork of the Red River below Altus Dam and on Rush Creek <br />are scheduled for completion in FY 81. <br /> <br />DESCRIPTION: (Tn) A survey-scope study to investigate the problems and <br />needs of the basin and determine the economic and engineering feasibility for <br />development of the area's water annd related resources. <br /> <br />SPONSOR: None at this time. <br /> <br />147 <br />
The URL can be used to link to this page
Your browser does not support the video tag.