Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />II. Tlrrv>r ""',dn DiR<'harae (1\cre-feetl. <br /> <br /> Haas. Flow 1\djusted for CRSP <br /> SUrface sto.......... Chan:IeS <br /> % of Nov. <br /> Haas. a.mul.ative Flow 75-Year <br /> Flow octd:ler average <br /> NovEsTi:ler thru NCM!IIi:ler (1922-96 <br />station 1996 ~r 1996 wa+-Ar 'UD:III't"'A.) <br />Green River at Green <br />River, utah 215,200 392,100 175,200 119 <br />Colorado River near <br />Cisco, utah 283,600 566,900 252,300 117 <br />San JUan River near <br />Bluff, utah 54,500 142,200 60,500 98 <br />At Lee Ferry <br />(l"rIlp'''': Point) 635,800 1,313,400 496,500 114 <br /> <br />III. I.cwer ""'..in Disd1arcle (l\cre-feetl. <br /> <br /> o.mUll.ative Flow <br /> octOOer <br /> November thru <br />station 1996 November <br />Below Hoover Dam 448,500 948,200 <br />Below Davis Dam 411,700 987,900 <br />Below Parker Dam 325,000 785,700 <br />Above Inperial Dam 332,100 770,600 <br /> <br />-2- <br /> <br />\ <br />\ <br />