Laserfiche WebLink
<br />7 <br /> <br />October for a dry year (1989) as modeled by CRDSS. <br /> <br />TABLE 1. Ranked Baseline Flow at Cameo. Ranked by hydrology (wet years to dry years). <br /> <br />TOTAL WATER YEAR FLOW APRIL TO JULY FLOW <br />.fuJ: Runoff (AF) E.lwk Percentile ~ Runoff (A F) R.l!!1k Percentile <br />1984 6200913 1 100.00% 1984 4743453 1 100.00% <br />1983 5244334 2 93,70% 1983 3954107 2 93.70% <br />1985 4991161 3 87.50% 1985 3716626 3 87.50% <br />1986 4986082 4 81.20% 1986 3642389 4 81.20% <br />1979 4005004 5 75.00% 1979 3201100 5 75.00% <br />1975 3833359 6 68.70% 1978 2994921 6 68.70% <br />1978 3746309 7 62.50% 1980 2879951 7 62.50% <br />1980 3736812 8 56.20% 1975 2792437 8 56.20% <br />1982 3632915 9 50.00% 1982 2694133 9 50.00% <br />1987 3084016 10 43.70% 1991 2243867 10 43.70% <br />1991 3008692 11 37.50% 1988 2061028 II 37.50% <br />1976 2910991 12 31.20% 1987 2028529 12 31.20% <br />1988 2829065 13 25.00% 1976 1991354 13 25.00% <br />1989 2530787 14 18.70% 1989 1763508 14 18.70% <br />1990 2359915 15 12.50% 1990 1712140 15 12.50% <br />1981 2069876 16 6.20% 1981 1414318 16 6.20% <br />1977 1760410 17 .00% 1977 1057750 17 .00% <br />