My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03293
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03293
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:37 PM
Creation date
10/11/2006 11:38:59 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.22
Description
UCRBRIP Section 7 Consultation/Sufficient Progress/PBO
State
CO
Basin
Colorado Mainstem
Date
1/1/1999
Author
USDOI
Title
Appendices to Final PBO
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3 <br /> <br />>Hoosier Pass Tunnel <br /> <br />7,712 <br /> <br />14,560 <br /> <br />10,345 <br /> <br />>Boustead Tunnel/Fry-Ark <br /> <br />14,427 <br /> <br />120,000 <br /> <br />78,978 <br /> <br />These projects divert water out of the Colorado River Basin and are modeled as 100% <br />consumptive use. <br /> <br />Other Projects included in the C, run, with their average annual depletion (acre-feet) in the <br />C, run (1975-91) <br /> <br />Contract <br />Amount <br /> <br />CRDSS Modeled <br />Amount <br /> <br />>Green Mountain Reservoir Contracts' <br />>Ruedi Round I Contracts' <br />>Ruedi Round II Contracts' <br />>Wolford Mountain Reservoir Fraser Demands <br />>Wolford Mountain Reservoir Middle Park Demands <br /> <br />20,000 <br />7,850 <br />17,000 <br /> <br />18,694 <br />7,765 <br />16,640 <br />o <br />338 <br /> <br />Operations that were in place historically for a portion of the 1975-91 study period that <br />were put in place in the C, run for the whole period <br /> <br />>Williams Fork Replacement for Dillon Reservoir out-of-priority Storage <br />>Green Mountain Reservoir to Government Highline <br />>Green Mountain Reservoir to Orchard Mesa Irrigation <br />>Green Mountain Reservoir to Orchard Mesa Pumping <br />>Green Mountain Reservoir to Vail municipal <br />>Hunter Creek Tunnel to Boustead <br />>Ruedi replacement for out-of-priority Diversions through Hunter Creek Tunnel <br />>Windy Gap <br /> <br />IDepletions associated with the total 154,546 acre-foot volume of Green Mountain <br />reservoir, including the power pool (which includes but is not limited to all of the 20,000 <br />acre-foot contract pool and the Historic User's Pool), and the Colorado Big Thompson Project <br />replacement pool are included in the programmatic biological opinion. <br /> <br />'Depletions associated with Ruedi Reservoir including but not limited to Ruedi I sales of <br />7,850 acre-feet are included in the programmatic biological. <br /> <br />'Depletions associated with Ruedi Reservoir including but not limited to Ruedi I I sales of <br />17,000 acre-feet of water as discussed in the Service biological opinion to Reclamation dated May <br />26, 1995, and as amended on January 6, 1999, and the Fryingpan Arkansas Project replacement <br />pool as governed by the operating principles for Ruedi Reservoir by excluding 21,650 acre-feet <br />from the marketable yield are included in the programmatic biological opinion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.