My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03268
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03268
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:30 PM
Creation date
10/11/2006 11:37:49 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10
Description
Colorado River-Water Projects-Glen Canyon Dam/Lake Powel-Glen Canyon Adaptive Management
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1993
Title
Western Area Power Administration-Issues for Discussion-Proposed SLCA/IP Firm Power Rate Adjustment
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />01223: <br /> <br />D-R-A-F-T <br /> <br />U <br />Q:t:rb:r 6. 1913 <br /> <br />P:\User\Thomas\95Rate\Rates <br /> <br />will increase the. reliability of the Blue Mesa <br />facilities and is planned to be completed in FY 1996 at . <br />a cost of approximately $3.2 million. <br /> <br />C. Western Colorado Phase 2 This project is planned for campletion <br />after NTP or an equivalent new transmission line provides a path for <br />power beyond the Four Corners area. This is expected to be beyond <br />FY 1999. and is therefore omitted from this proposed rate <br />adjustment. <br /> <br />D. Gunnison Substation Tap This is a new item not in the FY 1994 CB. <br />It is now planned for completion in approximately the year 2000, and <br />therefore is not included in the rate adjustment. <br /> <br />E. Hayden Substation UDrate This item is increased from $2.9 million <br />to $5.3 million. completing in FY 1998 to provide lncreased <br />reliability at the Hayden Substation. <br /> <br />F. ShiDrock Substation Staqe 06 The scope of this project is reduced <br />from the FY 1994 CB amount of $5.5 million to $1.9 million. <br />completing in FY 1994. It will provide increased reliability in the <br />230/115-kV switchyard. <br /> <br />G. Mobile Substation This $1 million dollar item is not required at <br />this time and is cancelled. <br /> <br />H. Havden--Vernal Upqrade This $1.5 million item has been cancelled. <br /> <br />1. ShiDrock-AlbuQuerQue The completion of this project wi 11 be in <br />approximately FY 1999. Since completion is not within the 5-year <br />window. it is therefore not included in this proposed rate <br />adjustment. <br /> <br />J. Curecanti-Midway Transmission Line This $88 million project will be <br />beyond the five-year window. <br /> <br />K. Four Corners 345-kV Switchyard This project is changed to co- <br />sponsored. reducing Western's obligation from $2 million to $1.4 <br />mi 11 i on. It wi 11 provi de increased re 1 iabil i ty and camp 1 ete the <br />345-kV interconnection from Shiprock. <br /> <br />L. DiD line Extension (OLE) This project is no longer included in <br />Western's budget request. <br /> <br />Conclusion: <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.