My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03263
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03263
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:29 PM
Creation date
10/11/2006 11:37:45 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.P
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
5/8/1979
Author
USACOE
Title
Transcript of a Public Hearing for Re-evaluation of A Flood Control Operation Plan for Hoover Dam: Phoenix AZ
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />. <br /> <br />~ <br />~ <br />~,: <br /> <br />c <br />.... <br /> <br />'-' <br /> <br />- <br /> <br />10 i that <br />II <br />11 il work <br /> <br />12 I <br /> <br />13 II <br /> <br />Ii, <br />~1 <br />II \-later going to rise in the Parker Strip? <br /> <br />,,~ I <br />I <br />::3 I <br />I came closer to the water and more dense. <br /> <br />z.j I <br />~loser to hea~T~~ci~R~~:co~~eig~aeb~~~~s~fEfi~tr::e~~li6~t <br />"5 Ii <br />i; <br />I <br />i <br />I <br />, <br /> <br />u <br /> <br />15 <br /> <br />20 <br /> <br />. <br /> <br />. <br /> <br />34 <br /> <br />2 <br /> <br />a foot, two feet, four feet or something like that. <br /> <br /> <br />COLONEL DOYLE: I can answer this. I understand <br /> <br />3 <br /> <br />'" <br />your concern and I can give you the assurance that whatever <br /> <br />'.. .... <br /> <br />4 plan is finally selected, and that's one of the things becaus <br /> <br />5 <br /> <br />~1at depends on what happens in terms of releases, whether <br /> <br />" <br />v <br /> <br />. <br />there will be additional details that need to be worked out <br /> <br />7 <br /> <br />even after a final plan is selected, coordinating with the <br /> <br />8 <br /> <br />various agencies that might have some cause and effect <br /> <br />9 <br /> <br />relationship on this. So, I guess my assurance to you is <br /> <br />your agency will certainly be contacted towork in these <br /> <br />shop meetings after a plan is selected. <br />MACK MILLER: Thank' you very much. <br /> <br />COLONEL DOYLE: Are there any other questions or <br /> <br />comments? Yes,. sir. <br /> <br />STAN THURBER: My name's Stan Thurber. I'm with <br /> <br />16 <br />I I, the Bureau of Indian Affairs and one question that I had in <br />17 <br />'II your presentation said that the highest amount of damage would <br />ltl <br />I be in the Parker Strip Area. Is this because of the more <br /> <br />19 <br /> <br /><, <br /> <br />extensive development in Parker Strip or is it because we <br />don't have a levee system in the Parker Strip or is the <br /> <br />GORDON FREENY: <br /> <br />It's beacuse the development <br /> <br />" (' ,If <br /> <br />(I" <br /> <br />.,.i, <br />
The URL can be used to link to this page
Your browser does not support the video tag.