My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03260
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03260
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:29 PM
Creation date
10/11/2006 11:37:42 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.120.10
Description
Grand Valley Unit-Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/10/1991
Title
Final Environmental Assessment: Alternative Lining Methods for the Government Highline Canal - Grand Valley Unit
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00 <br />00 <br />o <br />o <br />~') <br />..=) <br /> <br />TABLE OF CONTENTS <br /> <br />CHAPTER I - INTRODUCTION. . 1 <br />Purpose of Assessment 1 <br />Location 1 <br />Map 1 - Reach 1 of the Government Highline Canal 2 <br />Map 2 - Reach 2 of the Government High1ine Canal 3 <br />Grand valley Unit Final Environmental Impact Statement 4 <br />Purpose and Need . . . . . . . . . . 7 <br />Relationship with Other projects. . 8 <br /> <br />Chapter II - DESCRIPTION OF ALTERNATIVES. 9 <br />No-Action Alternative 9 <br />Membrane Lining Alternatives. . . . 9 <br />Modified Alternative Ml . . . . 9 <br />Figure 1 - Typical Membrane-Lined Section (MlMOD, <br />M3MOD) . . . . . . . . . . . 11 <br />Modified Alternative M3 . . . . . . . . . 12 <br />Alternative M4 . . . . . . . . . . . . . 12 <br />Figure 2 - Typical Membrane-Lined Section (M4, <br />C2MOD) . . . . . . . . . . . 13 <br />Concrete Lining Alternatives . . . . . . . . . 14 <br />Alternative C1 . . . . . . . . . . . . . 14 <br />Figure 3 - Typical Concrete-Lined Section (Cl, <br />C2MOD) . . . . . . 15 <br />Modified Alternative C2 16 <br />Other Alternatives . 16 <br />Alternative M2 16 <br />Alternative PI 16 <br />Alternative Gl 17 <br />Alternative SC 17 <br />Associated Actions. 17 <br />Access Permits 17 <br />Bridges. . . . 18 <br />Fencing. . . . 18 <br />Safety Features 19 <br />Fish and Wildlife Measures 19 <br />Summary Comparison of Alternatives 19 <br />Land Acquisition . . . . . . 19 <br />Table 1 - Comparison of Alternatives 20 <br />Construction and O&M Costs 21 <br />Recommended Alternative . . . . . . . . . 22 <br /> <br />CHAPTER III - AFFECTED ENVIRONMENT AND ENVIRONMENTAL <br />CONSEQUENCES . . . . . 23 <br />General Description of the Area 23 <br />General Impacts 24 <br />Land Use . 24 <br />Table 2 - Reach 1 Land Use Impacts (Fee Land) 26 <br />Table 3 - Reach 1 Land Use Impacts (Temporary ROW) 27 <br /> <br />ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.