My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03260
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03260
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:29 PM
Creation date
10/11/2006 11:37:42 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.120.10
Description
Grand Valley Unit-Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/10/1991
Title
Final Environmental Assessment: Alternative Lining Methods for the Government Highline Canal - Grand Valley Unit
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />L'j <br />00 <br />o <br />o <br /><..:') <br />:~ <br /> <br /> <br />~:'>'" <br />',1'. <br />.",) <br /> <br />United States Department of the Interior <br /> <br />BUREAU OF RECLAMAT10N <br />UPPER COLORADO REGIONAL OFFICE <br />P.O. BOX 11568 <br />SALT LAKE CITY, UTAH 84147 <br /> <br />IN REPLY <br />REFER TO: <br /> <br />9_Er. .J. 9 QQl <br /> <br />UC-1SO <br /> <br />To: All Those on Attachment A of the Enclosed Final Environmental <br />Assessment <br /> <br />Subject: Final Environmental Assessment (EA) and Finding of No Significant <br />Impact (FONSI); Alternative Lining Methods for the Government <br />Highline Canal, Grand Valley Unit, Colorado (Environmental <br />Assessment) <br /> <br />Enclosed for your information is a copy of the EA and FONSI on lining <br />alternatives for the east and middle portions of the Government Highline Canal <br />in Mesa County, Colorado. The canal is proposed to be lined as part of the <br />Grand Valley Unit, Colorado River Basin Salinity Control Project. The overall <br />purpose of the salinity control project is to decrease salt loading to the <br />Colorado River. <br /> <br />The EA supplements information contained in the final environmental impact <br />statement on the Grand Valley Unit, and evaluates alternative methods for <br />lining the Government Highline Canal between the town of Palisade and the <br />canal's crossing on 18 Road northwest of the town of Fruita. The final EA <br />incorporated comments received on the draft EA which was released to the public <br />on June 21, 1991. The recommended plan has been developed to address local <br />concerns to the maximum extent practical while still maintaining cost <br />effective canal construction, and operation and maintenance. I~ is intended <br />that these enclosures represent full compliance under the National <br />Environmental Policy Act. <br /> <br />Questions on the EA or FONSI should be referred to Jone Wright at the Bureau of <br />Reclamation's office in Grand Junction, Colorado at (303) 248-0638. <br /> <br />Sincerely, <br /> <br />~ MA~ ~ ~ ~0tt- <br /> <br />"'Roland Robison <br />Regional Director <br /> <br />Enclosures 2 <br /> <br />T"",-,\:,,') No\'<.. , FaNS! he", b",-"-,, \m'~'\ <LeI s~pu,~td y . <br />
The URL can be used to link to this page
Your browser does not support the video tag.