My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03251
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03251
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:26 PM
Creation date
10/11/2006 11:37:37 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.30
Description
CRSP
Basin
Colorado Mainstem
Date
3/11/1964
Author
CWCB
Title
March 1964 CWCB Board Memo RE: CRSP
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />A summary of our recommended priorities is as follows, <br />with more detailed information being attached hereto: <br /> <br />1. Basalt Project. <br />2. Great Northern Project. <br />3. Middle Park Project. (Troublesome and Rabbit Ear). <br />4. Yampa Valley Project. (Wessels, Hayden Mesa and <br />Toponas). <br />5. Juniper Project. <br />6. Eagle Divide Project. (Eagle Divide and Gypsum). <br /> <br />FLS:lk <br />Enclosure <br /> <br />Memo <br /> <br />-2- <br /> <br />March 2, 1964 <br /> <br />. .~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.