Laserfiche WebLink
<br />NO. 6 <br /> <br />EAGLE DIVIDE PROJECT <br /> <br />1. Location and water source: In the general area bounded by <br />Eagle, Holcott, Mccoy, Burns and <br />Gypsum, (Eagle County). piney <br />River, Eagle River and tributaries. <br /> <br />2. Estimated cost: <br /> Eagle Divide unit <br /> Gypsum Unit <br /> Total cost <br /> Cost allocated to <br /> irrigation <br />3. Irrigated acreage: <br /> Eagle Divide Unit <br /> Gypsum Unit <br /> Total irrigated <br /> acreage <br />4. Average cost per acre: <br />5. Average annual additional stream depletion: <br /> Eagle Divide Unit <br /> Gypsum Unit <br /> Total <br /> <br />6. Average annual stream depletion per acre <br />of irrigated land: <br /> <br />7. Benefit-cost ratio: <br />Eagle Divide Unit <br />Gypsum Unit <br /> <br />Average benefit-cost <br />ratio <br /> <br />$ 4,000,000 <br />6,200,000 <br /> <br />$10,200,000 <br /> <br />9,000,000 <br /> <br />10,875 <br />11,465 <br /> <br />23,340 acres <br /> <br />$386. <br /> <br />12,000 a.f. <br />7,300 a.f. <br /> <br />19,300 a.f. <br /> <br />.83 a.f. <br /> <br />1. 1 to 1 <br />.7 to 1 <br /> <br />.9 to 1 <br /> <br />The foregoing summary of the Eagle Divide Project is based <br />upon the status report of 1954. The information is therefore some- <br />what out of date. We have included the Gypsum unit as part of the <br />Eagle Divide Project, although it was treated separately in the <br />original status report. <br />