My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03244
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:23 PM
Creation date
10/11/2006 11:37:35 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.500.20
Description
Coordinated Long Range Reservoir Operations & Annual Operation Studies
Basin
Colorado Mainstem
Date
1/1/1975
Author
USDOI/BOR
Title
Coordinated Operation of Lake Powell and Lake Mead
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l. <br />things: <br /> <br />Colorado River Compac t. This Compact, mnonr, other <br /> <br />a. Divides the Colorado River Basin into an Upper <br />Basin and Lower Hasin at Lee Ferry, Arizona: <br /> <br />b. Divldes the beneficial consumptive use of water <br />betl<een the Upper and Lower Baslns: <br /> <br />c. Provides for a minimum delivery to the Lower lIasin <br />of 75,000,000 acre-feet every 10 years at Lee Ferry: <br />and <br /> <br />d. Provides for sharing equnlly, by the Upper and <br />Lover Basins, the burden of delivery of any deficiency <br />in water available in the Colorlldo River to ss tisfy <br />the vater Treaty vith the Republic of l-1exico. <br /> <br />2. Power and Hater Contracts. Power contracts have been <br />-_.- <br />executed wi th Hoover Dum allottees to sell them the generation of the <br />Hoover Powerplant. The pover contracts last for a perIod of 50 years <br />which ends on Hay 31, 1987. These contrncts are the hasiA for repayment: <br />of the Iloulder Canyon proj ec t. <br /> <br />Power contracts have also been c.xecuted wlth preference custotnf'rs <br />in the Colorado River Basin area for purchase of power and energy <br />available from the Colorado River Storage Project. Power contracts <br />have been executed vith customers in the Lower Basin for purchase of <br />pover and energy available from the Parker-Davis Project. <br /> <br />Hater contracts for the Lower Basin pursuant to Section 5 of the <br />Boulder Canyon Project Act are as follows: <br /> <br />California Agenciell - In the aggregate amount of 5,362,000 <br />acre-feet per year. <br /> <br />State of Arizona - 2,800,000 acre-feet per year plus one-half <br />of sny excess of surplus ,mter unapportioned hy the <br />Colorado River Compact. <br /> <br />Stat" of Nevada - JOO,OOO acre-feet per year. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.