Laserfiche WebLink
<br /> <br />. <br /> <br />2 <br /> <br />OPERATING PRINCIPLES, FRYINGPAN-ARKANSAS PROJECT <br /> <br />(g) "Ruedi Reservoir" means the reservoir presently <br />planned for construction on the Fryingpan River above <br />the town of Basalt as part of the project. <br />(h) "Ashcroft Reservoir" means not only the reservoir con- <br />templated for construction ,on Castle Creek, a tributary of <br />the Roaring Fork River, but also, unless the context re- <br />quires otherwise, any othe~ reservoir that may be construc- <br />ted in the Roaring Fork baSin above the town of Aspen in <br />lieu of that reservoir. <br />(i) "c.f.s." means cubic feet of water pel' second of time. <br />2. The Ruedi Reservoir shall be constructed and maintained on <br />the Fryingpan River above the town of Basalt "lith an active capacity <br />of not less than lOO,OOO acre-feet. In addition thereto and in <br />order to offset adverse streamflow conditions on the Roaring Fork <br />River above the town of Aspen which!might occur as a result of the <br />project enlargement of the Twin Lakes Reservoir, the Ashcroft <br />Reservoir on Castle Creek, or some reservoir in lieu thereof, shall <br />be constructed on the Roaring Fork drainage above Aspen to a capaci- <br />ty of approximately 5,000 acre-feet: Providing, However, That the <br />Ashcroft Reservoir shall be constructed only if the Secretary of the, <br />Interior after appropriate study shall determine that its benefits <br />exceed the costs: And providing futther, That no part of the con- <br />struction, operation;-or maintenanc~ of said Ashcroft Reservoir shall <br />be chargeable to the Fryingpan-ArkaI)sas project. <br />All of such stored water shall !he released under the conditions <br />and limitations hereinafter set forth. <br />3. The receipts from the sale of water from Ruedi Reservoir, as <br />permitted in paragraph 6(b) hereof, shall be applied solely to the <br />operation and maintenance costs and to those reimbursable construc- <br />tion costs of said reservoir which exceed $7,600,000. The cost of <br />perpetual operation and maintenance of the Ruedi'Reservoir shall be <br />home by users of project water and,users of water stored in Ruedi <br />Reservoir in such proportion as may:be determined by the Secretal'V <br />of the Interior. ! . <br />4. The inclusion of the Ruedi Reservoir in the project shall <br />not preclude the construction of any other replacement or regula- <br />tory reservoirs on the Colorado River or its tributaries above Cameo <br />gaging station. <br />5. The Ruedi Reservoir shall he completed and in operation <br />before any water is diverted to eastern Colorado by means of the <br />project. <br />6. (a) The replacement capacity of Ruedi Reservoir, and any <br />reservoir constructed in addition thereto, is that portion of the <br />total reservoir capacity required to permit project diversions at <br />times when such diversions could not otherwise be made because of <br /> <br />. <br /> <br />. <br />