Laserfiche WebLink
<br />19 <br /> <br /> <br />. <br /> <br />10~8 <br /> <br />Table 4 is a tabulation of water year 1974 proposed operation of <br />Turquoise Lake, and exhibit 7 is a graph of this operation. <br /> <br />Western Slope Collection System <br /> <br />. <br /> <br />There are five diversion points complete on the 1-lestern slope: <br />Sa1-lyer Creek, Chapman Gulch, South Fork of the Fryingpan River, <br />Fryingpan River at Marten Creek, and Lily Pad. Transmountsin <br />diversions at these points will be regulated to the end that no <br />diversions 1-lill be made that will reduce remaining aggregate <br />streamflo1-ls to less than those minimum standards contained in <br />the Fryingpan-Arkansas Project Operating Principles. For <br />planning purposes, data from our collection system yield, and <br />sizing studies 1-lere used to determine the diversions in 1974. <br />The 10-, 50-, and 90-percent chance values were obtained from the <br />probability curve sho1-ln on exhibit 2 and are considered to repre- <br />sent the reasonable minimum, most probable, and reasonable maximum <br />diversions, respectively. It is intended that, throughout the <br />year, all 1-later that is physically available above the minimum <br />fish bypass requirements will be diverted. <br /> <br />. <br />