My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03234
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03234
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:20 PM
Creation date
10/11/2006 11:37:22 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.300.02
Description
San Juan River Recovery Implementation Program - Recovery Plans & Information
Basin
San Juan/Dolores
Water Division
7
Date
10/29/1991
Title
San Juan River Recovery Implementation Program - Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5.0 FUNDING OF THE RECOVERY PROGRAM <br /> <br />o <br />C) <br />(..) <br />...., <br />c.n <br />0) <br /> <br />5.1 INTRODUCTION <br /> <br />One of the basic principles of this recovery program is that protection and <br />recovery is a cooperative responsibility. This specifically applies to <br />funding of the recovery program. The estimated expenditures for the recovery <br />program are divided into two areas, the annual operating budget and capital <br />funds. Several sources of funding will be needed to finance both annual <br />operations and capital expenditures associated with the recovery program. <br /> <br />5.2 ANNUAL RECOVERY PROGRAM BUDGET <br /> <br />The elements described in this document are considered necessary for the <br />protection and recovery of the rare fishes. The estimated annual operating <br />costs of these program elements are shown in Table 5-1. <br /> <br />TABLE 5-1. ESTIMATED ANNUAL COSTS OF RECOVERY PROGRAM <br /> <br /> ANNUAL <br />1. Program Management/Participation $ 380,000 <br /> a. Program Management ($ 70,000) <br /> b. Program Participation ($310,000) <br />2. Implementation of Instream Flows and Reoperation of Navajo <br /> Dam 250,000 <br />3. Habitat Development and Maintenance 110,000 <br />4. Water Quality Improvement 100,000 <br />5. Control of Non-native Fish Sepcies (Exotics) 40,000 <br /> <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.