My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03196
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03196
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:07 PM
Creation date
10/11/2006 11:36:16 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
6/30/1975
Author
Dames and Moore
Title
Flood Study Narrows Dam South Platte River
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />291'i <br /> <br />II-13 <br /> <br />The May 1894 storm was undoubtedly of major magnitude. Moreover, <br /> <br /> <br />the maximizing factor of 2,25, which is somewhat high for a major storm, <br /> <br /> <br />raised the level of the maximized storm to somewhere near the lower limit of <br /> <br /> <br />the confidence band for the 24 to 48-hour PMP, as indicated by comparison of <br /> <br /> <br />line E with lines F and G in Table 11-2. <br /> <br />It was stated earlier that the 24-hour rainfall was most <br /> <br />for deriving the project design flood, <br />value (7.9) of the May 1894 storm (line <br /> <br />The ratio of the maximized <br /> <br />important <br />24-hour <br /> <br />E, Table 11-2) to the 24-hour PMP <br /> <br />value of 8.7, obtained from transposing and maximizing the June 1964 storm <br />(line A), is 0.91. This ratio applied to the PMP values of line A yielded <br />the values shown on line C. Hourly values for the various subbasins can be <br />obtained by multiplying the values of Table 11-3 by 0.91. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The values of line C in Table 11-2 are definitely below the general <br />level of PMP for the project basin but apparently approximate the bottom <br />limit of the confidence band. Nevertheless, the combination of the, design <br />storm of line C with the most critical snowmelt flood conditions should yield <br />a reasonable and safe design flood, The snowmelt criteria given on pages 53 <br />to 64 of the Chatfield repor~/ are applicable to the project basin, <br /> <br />A comparison of the design storm of line C with a 1948 ' 9/ <br />estimate- <br />follows: <br /> Duration (hour s) <br /> 6 12 18 24 <br />1948 design storm 2.5 4.2 5.2 5.8 <br />Line C design storm 3.0 5.3 6.8 7.9 <br />Increase (percent) 20 '26 31 36 <br /> <br />~/ u.s. Weather Bureau, "Probab:e Maximum Precipitation over South Platte <br />River, Colorado, and Minnesota River, Minnesota", Hydromet Report 44. <br />1969. <br /> <br />I <br />I <br /> <br />'}j "Final-Type Spillway Design Flood Study, Narrows Damsite, South Platte <br />Subbasin, Colorado", memo dated February 5, 1948, by R. 1. Brasaemle <br />and D. L. Miller, Flood Hydrology Section, Bureau of Reclamation. <br /> <br />I <br /> <br />DAIVIIES e. MOORE <br />
The URL can be used to link to this page
Your browser does not support the video tag.