Laserfiche WebLink
<br /> Scenario <br /> Taylor-Park <br /> PARAMETER 7 8 9 10 11 Exchanqe <br />Gunnison Tunnel Ag (Capacity) 1300 cfs 1122 cfs 1122 cfs 1122 cfs 1122 cfs 1122 cfs <br />Aspinall Minimum release 300/600 J,J,A,S 300/600 J,J,A,S 300/600 J,J,A,S 200 cfs 300 cfs 300/600 J,J,A,S <br />Aspinall Minimum release Source Storage Storage Storage None None Storage <br />Aspinall Minimum release Priority None None None None P&I1 None <br />Gunnison Tunnel Hydro Operated Yes Yes Yes Yes Yes Yes <br />ESA releases (2000 cfs ~ Westwater) Yes Yes Yes No No Yes <br />ESA releases Priority None None None None <br />Maximum Amount 60,000 AF to be <br />taken in August & September <br /> <br />Boating <br />" <br /> <br />flows Amount <br />II Source <br />" Pri ori ty <br /> <br />600 cfs J,J,A,S 600 cfs J,J,A,S 600 cfs J,J,A,S <br />BM Storage BM Storage BM Storage <br />None None None <br />Yes Yes Yes <br />Yes Yes Yes <br />No No No <br />62 cfs/day 370 cfs/day A&S 62 cfs/day <br />Table 5 Table 5 Table 7 <br /> <br />None <br /> <br />None <br /> <br />600 cfs J,J,A,S <br />BM Storage <br />None <br /> <br />" <br /> <br />M&I (45,000 A.F. Reserved in 8m) <br />Released through Black Canyon <br />Released through Gunnison Tunnel <br />Release Rate <br /> <br />No <br /> <br />No <br /> <br />Yes <br />Yes <br />No <br />62 cfs/day <br /> <br />Blue Mesa Targets <br /> <br />Table 5 <br /> <br />Table 5 <br /> <br />Table 3 <br /> <br />Cannents: <br /> <br />Increases Gunnison <br />Tunnel Capacity <br /> <br />Concentrates M&I <br />deliveries in 2 <br />mos & results in <br />less bene's to <br />Fish & Boat Flows <br /> <br />Same as Scenario 5 Aspinall Units Aspinall Units <br />except BM targets not operated, not operated <br />were changed to gives Tunnel Hydro <br />look at impacts Priority over any <br />of ice jam protection of Min <br />recannendations Flows compare to <br />proposed by Upper Scenario 1 <br />Gunnison Oist in <br />an M-K study <br /> <br />Scenario 5 for <br />years 76-77-78 <br /> <br />N <br /> <br />Assigned Priorities <br /> <br />Gunnison Tun. Ag. Gunnison <br />8M BM <br />M&I M&I <br />Gunnison Tun Hydro Gunnison Tun <br />300 300 <br />ESA ESA <br />600 600 <br />2) BM = Blue Mesa Reservoir and one of three reservoirs <br />3) H&I = Hinuicipal & Industrial Use <br /> <br />Tun. Ag. Gunnison <br />BM <br />M&I <br />Hydro Gunnison Tun <br />300 <br />ESA <br />600 <br />in the Aspnall Project <br /> <br />f of f <br /> <br />Tun. Ag. Gunnison Tun. Ag. Gunnison Tun. Ag. Gunnison Tun. Ag. <br />Gunnison Tun Hydro 300 P&I1 8M <br />200 cfs Gunnison Tun Hydro M&I <br />Hydro Gunnison Tun Hydro <br />300 <br />ESA <br />600 <br /> <br />,.~ <br />-; <br /> <br />C',j <br />..j <br />C.' <br /> <br />ORS/bj <br />10/1/86 <br />