My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03159
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:57 PM
Creation date
10/11/2006 11:35:26 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.911
Description
Miscellaneous Small Projects and Project Studies - SE Needs Assessment and PSOP
State
CO
Basin
Arkansas
Water Division
2
Date
10/1/1999
Author
Montgomery Watson
Title
Draft Report Technical and Environmental Analysis of Storage Alternatives Permitting and Regulatory Issues
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />...... <br />,.e,. <br /> <br /> Table 1. Preliminary Regulatory Issues and Permitting Requirements - <br /> SECWCD-CSU Storage Alternatives ,....t. <br /> AUQust 9, 1999 <br />AQency I Action I Citation I Applicability <br />FEDERAL <br />US Bureau of Reclamation Reoperation of Storage Change in Operating Required for project reoperation or Pueblo or Turquoise reservoir enlargement <br /> Proiectlacility enlaraement Principles <br />US Army Corps of Section 404 Dredge and Fill Clean Water Act 33 USC Regulate discharge of dredged and fill material into waters of the US, including <br />Engineers Permit 1251 wetlands, dams, diversion structures, roads, pipelines, waste stockpiles, etc. <br /> Requires compliance with NEPA, ESA, NHPA, FWCA, and 404 (b)(l) evaluation. <br /> Also needs State 401 certification. <br />US Fish and Wildlife Service Section 7 consultation on Endangered Species Act, 16 Prerequisite to NEPA compliance and 404 permit decision. Ensures threatened <br /> threatened and endangered USC 1531 et seq. and endangered species are not adversely affected by the project. <br /> species <br /> Fish and Wildlife Fish and Wildlife Prerequisile to 404 permit decision. USFWS and CDOW prepare impact analysis <br /> Coordination Act Coordination Act, 16 USC and mitigation recommendations for fish and wildlife resources. <br /> Comoliance 661 el sea. <br />US EPA NEPA Compliance National Environmental Lead Federal agency prepares EA or EIS for major federal actions. EPA has <br /> Policy Act, 42 USC 4321 et formal aulhority with respecllo NEPA compliance. <br /> seq.; Clean Air Act Section <br /> 309 <br /> Section 404 (b) (1) Clean Water Act, 33 USC EPA has broad oversight and veto power over Corps of Engineer's 404 permit <br /> Compliance Review 1251 et sea. decisions. Criteria include water auality. alternatives T&E species, and miliQation. <br />US Advisory Council on Cultural Resource National Historic Prerequisite to NEPA compliance and 404 permit decision. Protects cultural, <br />Historic Preservation Clearance Preservation Act, 16 USC historic, and archeological resources in Ihe project area, <br /> 470a el esc. <br />US Forest Service Special Use Permit Federal Land Policy and Required for temporary use of national forest system lands, both for <br /> Management Act; National preconstruction site evaluation and project construction and operation. NEPA <br /> Foresl Manaaement Act compliance reauired. <br /> Forest Plan Consistency National Forest Project must be consistent with forest plan. Amending the plan may be necessary. <br /> Manaaement Act NEPA comDliance reauired. <br /> Land Tenure Adjustment Required for permanent ownership of forest system lands, either through purchase <br /> or exchanae. NEPA compliance and Conaressional Approval reauired. <br /> Timber Sale Contract National Forest For clearing of timber from reservoir pool, road corridors, construction sites, etc., <br /> Manaaement Act on Forest SeIVice Land. <br />US Bureau of Land ROW or Temporary Usa Federal Land Policy and For temporary use of BLM land. NEPA compliance required. <br />Manaaement Permit ManaQement Act <br /> <br />, <br /> <br /><<D> <br /> <br />12 <br /> <br />Permitting and Regulatory Issues <br />
The URL can be used to link to this page
Your browser does not support the video tag.