Laserfiche WebLink
<br />.", ......>..' ,,~.'>-. <br /> <br />-,,:.:. <br /> <br />.,..-.,','.;..' - <br /> <br />-<::l" <br />C.,] <br />Cf') <br />,.~ <br />c.) commenced when this BUIn equals the total physical capacity of that <br />l~) reservoir, to the level of the uncontrolled spillway i.e.-2,219,000 <br />acre feet in 1942. <br /> <br />(c) All water actually spilled at Elephant Butte Reservoir, or <br />released therefrom, in excess of Project requirements, which is cur- <br />rently passed through Caballo Reservoir, after the time of spill, <br />shall be considered as Actual Spill, provided that the total quantity <br />of water then in storage in Elephant Butte Reservoir exceeds the phy- <br />sical capacity of that reservoir at the level of the sill of the <br />spillway gages, i.e.-l,B30,000 acre feet in 1942. <br /> <br />(d) Water released from Caballo Reservoir in excess of Project <br />requirements and in excess of water currently released from Elephant <br />Butte Reservoir, shall be deemed Usable Water released, excepting <br />only flood water entering Caballo Reservoir from tributaries below <br />Elephant Butte Reservoir. <br /> <br />EVAPORATION LOSSES IJ. <br /> <br />The Commission shall encourage the equipping, maintenance arid <br />operation, in cooperation with the United States Weather Bureau or <br />other appropriate agency, of evaporation stations at Elephant Butte <br />Reservoir and at or near each major reservoir in the Rio Grande <br />Basin within Colorado constructed after 1937 and in New Mexico con- <br />structed after 1929. The net loss by evaporation from a reservoir <br />surface shall be taken as the difference between the actual evapora- <br />tion loss and the evapo~transpiration losses which would have occur- <br />red naturally, prior to the construction of such reservoir. Changes <br />in evapo-transpiration losses along stream channels below reservoirs <br />may be disregarded. <br /> <br />Net losses by evaporation, as defined above, shall be used in <br />correcting Index Supplies for the operation of reservoirs upstream <br />from Index Gaging Stations as required by the provisions of Article <br />III and Article IV of the Compact. . <br /> <br />In the application of the provisions of the last unnumbered <br />paragraph of Article VI of the Compact: <br /> <br />(a) Evaporation losses for which accrued credits shall be re- <br />duced shall be taken ss the difference between the gross evaporation <br />from the water surface of Elephant Butte Reservoir and rainfall on <br />the same surface. <br /> <br />(b) Evaporation losses for which accrued debits shall be re- <br />duced shall be taken as the net loss by evaporation as defined in <br />the first paragraph. <br /> <br />IJ. Amended at Tenth Annual Meeting, February 14, 1949. <br /> <br />',..", '-.':. <br /> <br /> <br />I <br />I <br /> <br />>'~ , <br /> <br />"''<;:'. <br /> <br />- <br />