Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. (. 1 (\ 7 4 <br /> <br />5.) Reservoir Storaqe and Evacuation Operations: <br /> <br />a.) Description of normal annual operating plan for Crawford Reservoir: <br /> <br />i.) filling period: April-May <br /> <br />ii.) use of runoff forecasts: No portion of Crawford Reservoir has been allocated <br />exclusively for flood control. No specific flood control operating plans have been <br />established for Crawford Reservoir. Surcharge storage (3880.0 Acre-feet) in <br />combination with the uncontrolled spillway protect the dam from the inflow design <br />flood. (from Standing Operating Procedures, Crawford Dam and Reservoir, smith Fork <br />Project, Colorado) (runoff forecasting not applied) <br /> <br />iii.) administration date: November 1 <br />iv.) conditions under which storable water would not be stored: <br /> <br />vi.) conditions under which releases might be made other than to meet demands: <br /> <br />~.) Specific end-of-month storage targets: No limitations on filling or drawdown of <br />the reservoir have been established except for minimum water surface drawdown below <br />elevation 6471.7 without prior approval. (from Standing Operating Procedures, Crawford <br />Dam and Reservoir, smith Fork Project, Colorado) <br /> <br />c.) Is seasonal evacuation of the reservoir conditional upon demands, or would the <br />reservoir be drawn down to the given levels regardless of demand ? <br /> <br />6.) Minimum Instream Flows below Crawford Reservoir (if anv). <br /> <br />a.) Definition of stream reach(es). <br /> <br />b.) Periods and amounts. <br /> <br />c. ) Decrees <br /> <br />4 <br />