Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />.' lP72 <br /> <br />2.l smith Fork proiect Deliverv Systems: <br />a.) smith Fork Feeder Canal (from Smith Fork Diversion Dam to Crawford Reservoir) <br />i.) Physical capacity limitation: 80 cfs (Attachment A) <br />ii.) Assumed Period of Operation: (?) <br />iii.) Associated Water Rights: 85.62 cfs, Admin. No.: 38064.35309 <br />64.38 cfs, Admin. No.: 47847.47095 <br />(Attachment D) <br /> <br />b.) Aspen Canal (from Crawford Reservoir to North Fork Drainage): <br />i.) Physical Capacity Limitation: 125 cfs (Attachment A) <br />ii.) Assumed Period of operation: (?) <br />iii.) Associated Water Rights: 150 cfs, Admin. No.: 38064.35309 <br />(Attachment D) <br /> <br />3.l Aqricultural Demands (qrouped into divisionsl: <br />a.) Name or Category: ** <br /> <br />b.) Irrigated acreage: <br /> <br />** <br /> <br />c.) No. of shares: <br /> <br />(?) <br /> <br />d.) Average monthly demands: ** <br />(Diversions) <br />e.) Net efficiency (C.U.jDiversion): ** <br /> <br />f.) Primary source of irrigation water: <br /> <br />** <br /> <br />g.) Supplemental source of irrigation water: <br /> <br />** <br /> <br />h.) Return flows to: <br /> <br />** <br /> <br />i.) Description of operations: <br /> <br />** <br /> <br />2 <br />