My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03128
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:48 PM
Creation date
10/11/2006 11:32:54 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.09B
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
5/1/1991
Title
Comments re: Glen Canyon Dam EIS Preliminary Alternatives Report
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Glen Canyon Dam Environmental Impact statement <br />May 1, 1991 <br />page 2 <br /> <br />for detailed analyses in the EIS." It is our opinion that those <br />alternatives that cannot be considered to be "reasonable" must be <br />eliminated from further study and that any alternative that could <br />not be implemented within the existing legal framework is not a <br />"reasonable" alternative. The Bureau of Reclamation has identified <br />four such flow alternatives. These four alternatives should be <br />eliminated and not fully evaluated in the draft GCD-EIS. Each <br />alternative considered in the GCD-EIS must fully protect and <br />preserve the allocation and use of the waters of the Colorado River <br />provided by compact, treaty, law, or court decree to each of the <br />Basin states. Also, the ability to maintain conservation storage <br />in the Colorado River System reservoirs and to meet water delivery <br />requirements to the Lower Basin must not be compromised. <br /> <br />It is important that the public be made aware of the full <br />extent of the process being utilized to prepare the GCD-EIS to <br />avoid any misunderstanding or misgiving regarding the "preliminary <br />alternatives," the final alternatives and the time frame within <br />which each will be evaluated. At present, this process appears to <br />be unclear in the minds of those working on the GCD-EIS as well as <br />the public in general. <br /> <br />We appreciate the opportunity to provide comments on the <br />preliminary alternatives being considered in the GCD-EIS process <br />and wish to continue to be involved in that process. <br /> <br />Very truly yours, <br /> <br />41' A/J/?~ ........1_"'-" <br />~a,~~'lf. ~. <br />Gerald R. Zimmerman <br />Executive Director <br /> <br />cc: Colorado River Basin states Representatives <br />Commissioner of Reclamation, USBR <br />Assistant Commissioner Resource Management, USBR <br />Upper and Lower Colorado Regional Directors, USBR <br />
The URL can be used to link to this page
Your browser does not support the video tag.