Laserfiche WebLink
<br />.! <br /> <br />'."./0':, <br />(Y) <br />.-oj <br />N <br /> <br />/ <br /> <br />Canals <br /> <br />Maybe11 <br />Sunbeam <br />Axial (East) <br />Deception <br />Dry Lake <br /> <br />Axial Pumping Plant <br />Juniper ~owerplant <br /> <br />WATER SUPPLY: <br /> <br />Length <br />26 mi. <br />37 mi. <br />26 mi. <br />9.1 mi. <br />6.2 mi. <br /> <br />Increased water supply for irrigation annually..... <br />Annual stream depletion ............................ <br /> <br />BENEFIT-COST ANALYSIS: <br /> <br />annual <br />Primary <br />Secondary <br />Total <br /> <br />benefi ts <br />~2,563,500 <br />1,114,500 <br />~3,678,OOO <br /> <br />proj ect <br />OM&R <br />CRSP <br /> <br />BENEFIT-COST RATIO: <br /> <br />Direct <br />Total <br /> <br />1. 21 <br />1.73 <br /> <br />(+$438,000 net benefi ts) <br />. (+$1,552,500 net benefits) <br /> <br />..__.__..'---_.-.~--._,;:-. <br /> <br />Capacity <br />260 CFS <br />130 CFS <br />325 CFS <br />100 CFS <br />30 CFS <br /> <br />25,000 H.P. <br />30,000 kilowatts <br /> <br />116,300 A.F. <br />83,600 A.F. <br /> <br />Average annual <br />equivalent cost <br />investment $1,632,000. <br />326,300 <br />167,200 <br />$2,125,500 <br />