Laserfiche WebLink
<br />, <br />"..:" <br /> <br /> Canals <br />" ! . Length <br />r... Yellow Jacket 15 mi. <br />0) Josephine Basin 39.5 mi. <br />0-1 Coal Creek" 18.5 mi. <br />C\l Lost Park Collection 5.5 mi. <br /> East Milk Creek Lateral 12 mi. <br /> West Milk Creek Lateral 19 lilt. <br /> Morapos Feeder Canal 4.5 mi. <br /> <br />Capaci ty <br />500_ CFS <br />300 CRS <br />175 CFS <br />100 CFS <br />50 CFS <br />90 CFS <br />70 CFS <br /> <br />WATER SUPPLY: <br />Diversion requirement (per irrigable acre) ....... <br />Increased water supply for irrigation annually... <br />Increased water supply for M&I annually.......... <br />Annual stream depletion by project ............... <br />Minimum fish bypass, October-March ............... <br />Minimum fish bypass, April-September ............. <br /> <br />3.50 A.F. <br />80,100 A.F. <br />50,000 A.F. <br />57,100 A.Fit <br />30 CF~ <br />70 CFsl/ <br /> <br />BENEFIT-COST ANALYSIS (lOO-year period at 3 percent) <br /> <br />Average <br />annual benefits <br />Primary (direct) <br />Secondary <br />Total <br /> <br />$1,721,000 <br />773,600 <br />$2,494,700 <br /> <br />Project <br />QM&R <br />Share of <br />Total <br /> <br />Annual <br />equivalent costs <br />investment $1,042,600 <br />103,700 <br />CRSP costs '114,200 <br />$1,260,500 <br /> <br />BENEFIT-COST RATIOS: <br /> <br />Direct 1.37 <br />Total 1.98 <br /> <br />NET ANNUAL BENEFITS: <br /> <br />Direct benefits <br />Total benefits <br /> <br />$ 460,600 <br />$1,234,200 <br /> <br />lIIf fish bypasses are increased to 65 second-feet and 100 <br />second-feet, then the M&l water delivered would be reduced to 40,000 <br />acre-feet annually. <br />