My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03108
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:42 PM
Creation date
10/11/2006 11:32:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.131.J
Description
Yellow Jacket Project
State
CO
Basin
Yampa/White
Water Division
6
Date
2/1/1965
Title
Yellow Jacket Project Colorado: Plan Formulation Studies
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br />A <br /> <br />'...- <br /> <br />00 <br />""" <br />~ <br />c-J <br /> <br />December 1964 <br /> <br />SUMHARY SHEET <br /> <br />YELLOW JACKET PROJECT, OOLORADO <br /> <br />, <br /> <br />Units 1 and 2 (original studies) \.~,,) <br /> <br />LOCATION: Along the White and Yampa River Basins in northwestern <br />Colorado. <br /> <br />~: The multi-purpose project would provide storage for recreation, <br />fishery, municipal and industrial water, and the irrigation of <br />47;570 acres of land including 6,841 acres of supplemental <br />service land and 40,729 acres of full service lands. Principal <br />features of the project are: Lost Park Reservoir, located on <br />Lost Creek, a tributary of the Nort~ Fork of the White River; <br />Thornburgh Reservoir, located on Milk Creek, Ripple Creek Reser- <br />voir, located on the North Fork of the White River; Yellow Jacket <br />Canal, which diverts from the North Fork of the l~ite River and <br />terminates at Thornburgh Reservoir; Josephine Basin Canal, divert- <br />ing from the Yellow Jacket Canal and serving project lands in the <br />Little Beaver, Flag Creek and Josephine Basin areas (during off- <br />peak periods the Josephine Basin Canal would deliver municipal <br />water at its terminus to private conveyance facilities); Coal <br />Creek Canal diverting from the Yellow Jacket Canal and deliver- <br />ing project water to project lands in the Coal Creek area; and <br />the Axial Canal which diverts from Thornburgh Reservoir and pro- <br />vides project water to the lands in Axial Basin. <br /> <br />COST: Construction costs (costs are reconnaissance and subject to change) <br />- <br /> <br />Reservoirs <br />Lost Park <br /> <br />..................................... <br /> <br />$ 2,627,000 <br />2,940,000 <br />5,081,000 <br />600,000 <br /> <br />Thornburgh .................................... <br />Ripple Creek .................................. <br />Jubb Creek (terminal storage) ................. <br />Canals <br />Yellow Jacket ................................. <br />Axial......................................... <br />Josephine Basin ............................... <br />Coal Creek .................................... <br />Ute Feeder .................................... <br />Lost Park Collection .......................... <br />Ilea .......................................... <br />Laterals and drains .............................. <br />To tal .........'............................. <br /> <br />12,290,000 <br />9,632,000 <br />6,720,000 <br />2,736,000 <br />264,000 <br />964,000 <br />628,000 <br />8.118.000 <br />$52,600,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.