Laserfiche WebLink
<br />lD <br /> <br />Plan~ <br /> <br />,C\l <br /> <br />loit 1 <br /> <br />}nits 1 \& 2 <br />(a) <br /> <br />Inits 1 &. 2 <br />(b) <br /> <br />llnits I, 2, <br />6 J <br />(a) <br /> <br />Units I, 2, <br />& 3 <br />(b) <br /> <br />Unitsl&2/ <br /> <br />(/-~ <br /> <br />tts ~) <br /> <br />COMPARATIVE APPRAISAL OF PLANS <br /> <br />Deseri tion <br /> <br />Serves \Illite Riv..er drainage <br />only <br /> <br />Addition of lands in Axial <br />Basin to above <br /> <br />Increase stream diversion <br />from above plan for increase <br />in M&l supply <br /> <br />Same as Units 1 and 2 (3) <br />\.Jith addition of S~Jeetbriar <br />Reservoir <br /> <br />Substitution of Rio Blanco <br />Reservoir for Sweetbriar in <br />above plan <br /> <br />Benefit <br />to <br />cost.'Tatio <br /> <br />Net annual <br />benefits <br />$ <br /> <br /> <br />Original Yellow Jacket Studies <br /> <br />1.20:1 (2) <br />1.85: 1 (3) <br /> <br />0.84:1 (2) <br />1.52: 1 (3) <br /> <br />0.97: 1 (2) <br />1.64: 1 (3) <br /> <br />1.18: 1 (2) <br />1.79: 1 (3) <br /> <br />1,07: 1 (2) <br />1.62: 1.(3) <br /> <br />+ 185,300 (2) <br />+ 797,200 (3) <br /> <br />334,000 (2) <br />+1,109,500 (3) <br /> <br />77,900 (2) <br />+ 1,365,100 (3) <br /> <br />+ 436,500 (2) <br />+1,879,500 (3) <br /> <br />+ 194,000 (2) <br />+1,637,000 (3) <br /> <br />Combined Juniper and Yellow Jacket Studies <br /> <br />Serves same irri~ted area <br />os Unit 1 in original <br />studies, but "Yellow Jacket <br />Canal less expensive <br /> <br />l~ovides increased irriga- <br />tion to area in vicinity of <br />Axial and Hamilton, Colorado <br /> <br />Units I, 'Z'i ' Combination of units 1, 2, <br />~__,.(~ and 3 <br /> <br />~its 1, f,)~~dition of Ri~ple Creek <br />,__ & 6 ,:Meservoir -to Units land 2 <br />--,"-_._~--I'- , <br />for d&l t>urposes <br /> <br />Unit 4 <br /> <br />Ju.niper Project wit:l the <br />addition of service to the <br />remaining Axial Basin lands <br /> <br />Junil>er :'roject as ~rcsentcd in the 1963 <br />Reconnaissance Report <br /> <br />Unlt5 4 &: 5 <br /> <br />Units I, 2, <br />3, & 4 <br /> <br />Units 1, 2, <br />3, 4, &: 5 <br /> <br />Units 1, ~, <br />3, ~ L' 6 <br /> <br />Units I, 2, <br />3,4, 6, ano <br />Rio Blanco <br />Reservoir <br /> <br />Addition of land in Deception <br />Creek Drainage <br /> <br />Addition of Unit 4 to Units <br />1, 2, and 3 <br /> <br />Addition of Deception Creek <br />area to previous plan <br /> <br />Additiun 0: Ripple Cre~~ <br />Reserv0ir to Units 1, 2, 3, <br />and 4 <br /> <br />Addition of Rio Blanco (!jt-..f/~v.f.v <br />Reservoir to p Ian above for <br />maximum }Utl development <br /> <br />1.27: 1 (2) <br />1.96:1 (3) <br /> <br />1.15:1 (2) <br />2.17:1 (3) <br /> <br />1,23:1 (2) <br />1.97: 1 (3) <br /> <br />1:40: 1 (2) <br />1.95: 1 (3) <br /> <br />1.24:1 (2) <br />1.72: 1 (3) <br /> <br />1.38:1 (2) <br />1.62:1 (3) <br /> <br />1.21: 1 (2) <br />1.73:1 (3) <br /> <br />1.24: 1 (2) <br />1.81: 1 (3) <br /> <br />1.22:1 (2) <br />i.81: 1 (3) <br /> <br />1.25: 1 (2) <br />1,79:1 (3) <br /> <br />1.29: 1 (2) <br />1.74:1 (3) <br /> <br />+ 239,000 (2) <br />+ 850,300 (3) <br /> <br />+ 24,500 (2) <br />+ 186,700 (3) <br /> <br />+ 249,500 (2) <br />+1,,):)3,luO (3) <br /> <br />+ 436,800 (2) <br />+1,048,200 (3) <br /> <br />+ 455,600 (2) <br />+1,379,200 (3) <br /> <br />+ 495,000 (2) <br />+ 819,000 (3) <br /> <br />+ 438,000 (2) <br />+1,552,500 (3) <br /> <br />+ 705,100 (2) <br />+2;402,300 (3) <br /> <br />+ 687,000 (2) <br />$2,575,100 (3) <br /> <br />+ S09,800 (2) <br />+2,507,000 (3) <br /> <br />+1,055,400 <br />+2,712,600 <br /> <br />(2) <br />(3) <br /> <br />3.0,000 <br /> <br />10,5.00, <br /> <br />30,000 <br /> <br />80,400 <br /> <br />80,400 <br /> <br />30-,.0.00 v <br /> <br />None <br /> <br />30,000 <br /> <br />55,POQ <br /> <br />30,000 <br /> <br />JO,OOO <br /> <br />55,000 <br /> <br />105,400 <br /> <br />23" 226 <br /> <br />47,579 <br /> <br />47,570 <br /> <br />47,570 <br /> <br />47,57.0 <br /> <br />23,220 <br /> <br />5,43.0 <br /> <br />28,656 <br /> <br />23,226 <br /> <br />18, 239il <br />y" <br /> <br />9,000 <br />Y <br />2~,21~ <br />y <br />46,89:Pf <br />Y <br />51,86~ <br />y <br /> <br />46.895 <br /> <br />46, 895!d <br />Y <br /> <br />30 and 70 <br /> <br />30 and 70 ~ <br /> <br />10 and 10 in <br />dry years and <br />30 and 60 in <br />average years <br /> <br />30 and 70 <br /> <br />30 and 70 <br /> <br />s~ <br />rO <br />SJ <br />_..---:: <br />I~~ <br /> <br />30 and 70 <br /> <br />30 and 70 <br /> <br />30 snd 70 <br /> <br />JO and 70 <br /> <br />30 and 70 <br /> <br />30 snd 70 <br /> <br />.3<) and 70 <br /> <br />l/This is a miminum fish bypass made at the Yellow Jacket Canal diverS'ion. Average release Hill be <br />3teater til'i'n these figures. <br />(2)Based on di~ect benefits. <br />(3)Based on total benefits. <br />~Also produces 27,OOOkilowstts of saleable capacity. <br />~Al1 costs used in the H&I increments .~based-'-o~~'y_of the ..later at t:le end of Josepliine Basin <br />Canal at an elevation of approximately 6,800 feet. Any terminal storage costs or costs for delivery of t:ater to other <br />locations are not included in the analysiS. Some plans may require oora terminal storage than others bec3use of <br />delivery t>atterns. <br />2J!nis does: not include 9,000 acres: served under.tlJ,e Deadmand Benc!l and Sunbeam Canals of the Juniper ?roject. <br /> <br />.. <br />