Laserfiche WebLink
<br />~ <br /> <br />~ have an average annual cost of $700,000, or a unit eost of about $4 <br />~ <br /> <br />per ton of salt kept out of the river. <br /> <br />] <br />~ <br />, <br />'.' ~ <br />.~ <br />l <br />'J <br />9 <br />"~ <br />! <br /> <br />, , <br />" <br /> <br />. <br /> <br />o <br /> <br />t-. i <br /> <br />Three projects would control mineral springs~ one at GlenwQod <br />fipdllgll, colorudo; one ot ta Verkin Spr.irtgs, Utllh; and the t:hi.t"d at: <br />Blue Springs, Arizona. About 70 percent of the flow of Glenwood and <br />Dotsero Springs, near the town of Glenwood Springs, could be cont~ol- <br />led and 370,000 tons of salt annually removed by means of a desalting <br />plant with a capacity of 16 milHotJ gallons \>('r day. tJrlnes could <br />be disposed of by subsurface injection lnto dOl~fI wdlB. This project <br />would hav(~ nl1 IlvcruBe annual cost of $S,OOO,OOO, aud a Unit coat of <br />$14 per ton of salt removed. <br />About 70 percent of the flow of La Verkin Springs, on the Virgin <br />River, could be captured. This quantity, about 7,000 acre~feet an- <br />nually containing about 80,000 tons of salts, would be conveyed to an <br />cvnporot iOIl [l(l\1d and thus eli.minatcd from the river. This project is <br />dBtimated to have Un average annunl cost of $600,000, nnd a udit cost <br />of about $8 per ton of salt removed. <br />The largeBt natural point source in the Colorado River Basin is <br />Blue Springs on the Little Colorado River. The project to eliminate <br />its 500,OOO~tort annual salt contribution consists of a low dam down <br />stream of BlUt' Springl1 to intercept the spri.ngs' flow, pumping plants <br />t~ansport the water to Flagstaff, and a <br /> <br />, <br />, <br />1 <br />,. <br />~ <br /> <br />I <br />, <br />., <br />~1 <br />j <br />~ <br /> <br />, <br />I <br />~ <br />1 <br />,j <br />l <br /> <br />1 <br />;~ <br />I <br />, <br /> <br />'i,i <br /> <br />i <br />~~ <br /> <br />I <br /> <br />~"""''''''''~<t.~""",__ .'~......._''''''_......__ "-"""_ <br />and conveyanc~ facilities to <br />. -".'" \~...-......~ -"-..,,, ",.....-.... <br /> <br />/\0,..,,, <br />desalting plant at Flagstaff Where the. d~salted water would be sold. <br /> <br />>~""-""'-~'" ...."'--,~ <br /> <br />This project would have an average annual cost of $16 million, or <br />$32 per year per ton of salt removed. The project also has possibil- <br /> <br />I ti 1'1"1 ,1.0" itK""pot"(ltl.oll or pump Ht(lt.i1g.~ and powl:r rtlcovery fenCures. <br /> <br />-9- <br /> <br />:, ' <br />. <~ -."j\\ <br />