Laserfiche WebLink
<br />------------------- <br /> <br />TABLE 3 (1) (Continued) <br /> <br />UNDEVELOPED MAJOR WATER RIGHTS <br />WHITE RIVER BASIN <br /> <br />_J <br />',;;:. <br />:'" <br />.-J <br /> <br />Project Name <br /> <br />Priority <br />Number' <br /> <br />'.::::; <br /> <br />Start-Up <br />Date . <br /> <br />Future Additional <br />Depletion - AF (Approx.) <br /> <br />*' <br /> <br /> Highland Ditch (4th Enlargement) 7010 2005 6,100 <br /> Big lick Reservoir, 1st Enlargement 7220 0 <br /> ~1ob1ey No.1 Pipe1 ine 688D 2000 800 <br /> Mead Irrigation System Pumping Plant 57 gO 0 <br /> Phi 11 i ps Ditch 5660 0 <br />- Barbour South Side Ditch 5500 0 <br />- Existing <br />I <br />N <br />"" Bruce Baker Ditch 5350 0 <br /> Ridgeway and State1er Ditch 1480 0 <br /> Pioneer Ditch 1390 0 <br /> Sherman Taylor Pipeline 7100 2045 500 <br /> Stillwater Project 5780 1985 35,000 <br /> White River Pumping Pipeline and Multiple 0 <br /> Reservoir Project <br /> Figure Four Project Multiple 0 <br /> Imes-Reyno1ds-McKei1 Ditch <br /> (Third Enlargement) 7390 2045 200 <br /> Martin Villa Reservoir 7310 0 <br /> Hefley No. 3 Pumping Plant 5790 0 <br /> Range1y Water Plant Multiple 1980 15,000 <br /> Yellow Creek Project Multiple 1985 0 <br />