My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03088
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:34 PM
Creation date
10/11/2006 11:32:12 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8221.112
Description
Central Arizona Project
State
AZ
Basin
Colorado Mainstem
Date
12/23/1980
Title
News Articles/Press Releases: 1981-1985
Water Supply Pro - Doc Type
News Article/Press Release
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />c:;) <br />~ <br />C\J <br />C"j <br />C <br /> <br />'l:""- <br />[~~) <br /> <br />~ <br />W_i.,' <br />~.... <br /> <br />,- <br />-- <br /> <br />We have concluded that it is appropriate to prepare an Environmental Impact <br />Statement in conjunction with Phase B advance planning studies. The early <br />advance planning efforts will evaluate alternatives and issues associated <br />with capacity (size), terminus locations, energy use, cost, water needs, user <br />distribution systems, and environnental impacts. <br /> <br />For purposes of continuing planning and environmental study activities, it is <br />appropriate for an agency to select a preferred alternative or proposed action. <br />Consequently, the 3ureau of Reclamation planning activities with respect to <br />the Tucson Aqueduct should identify as the proposed action; conveyance facilities <br />sized to accommodate flows between 750-050 cubic feet per second, regulatory <br />storage, appurtenant service facilities, and proposed terminus located near the <br />south boundary of the San Xavier Indian Reservation. <br /> <br />In sill1~ary, the discussions above are intended to give guidance to the Bureau <br />of Reclamation and to assist in our planning and public inYolYE:~~~::t e.cti~tities. <br />Final decisions can~ot be made until planning and enviro~~ental studies are <br />complete and the :;'t.:.blic has had an oppcrtu:;ity to co~r.rete::siYel:,. re-rie.r; a::..:5. <br />pr9vide cO!'!"\.:.'l1ents on the findings and rece.~~ena.ations contained in the plali~:1ing <br />and environmental dOCQ~ents. <br /> <br />Prerequisite studies include sound engi:;.eering and fir~t3.r:cial e7alu9.....:;~cns, and <br />f"J.l1 disclost4l"~ of e:.;li.ron.mental irr~pacts. ...J1ese st.uales ar~ cont.i.~se~t O~l <br />congressional appro:;:'ri~tiQns and are scheduled in suc~ a "~ray ttat :'i::al <br />decisions can l05ice..lly folIo,", t~e sequence noted above. Tee guic.e.:lce ?~'c.'!ided <br />~erein is expected to lead to pr~jent decisions Hith res;ect to t~~ c8~;:~tion <br />of the CAP. Reo.uests to Congr~ss for f~~ds ~ill be ~aie ~cr t~~se sever~: <br />activities in acco~"j .~tith our overall Recla~ation Progra..':l ar..i t::e P-resic..c:!-::.~ 1 s <br />plan for economic recovery. <br /> <br />I"'~,..(.' c::.~ - -.... ~." <br />._-c....j...<;;...'..:,.. ! <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.