Laserfiche WebLink
<br />BUREAU OF RECLAMATION <br /> <br /> <br /> <br /> <br />DEPARTW"1'E <br /> <br />9;..- <br /> <br />at') <br />C': <br />C"'; <br /> <br />,- <br />'. <br /> <br />- <br /> <br />City, NV December 15, 1983 <br /> <br />~For Immediate Re1e,a,se <br /> <br />("i~!\ I i:Z. '~ <br />o (ot . {'vfO' vi p~ <br />#:. &~j\ frvi <br />Iff <br /> <br />The Bureau of Reclamation is proposing <br /> <br />- (602) 261-3106 <br />(602) 261-3107 <br /> <br />RECLAMATION SELECTS MODIFIED <br />ROOSEVELT DAM FOR PLAN 6 <br /> <br />to modify the existing Roosevelt Dam as <br /> <br />part of Plan 6, according to Bill Plummer, Director of Reclamation's Lower Colorado <br /> <br />Region. <br /> <br />The proposal will be contained in the final Environmental Impact Statement on <br />the Regulatory Storage Division of the Central Arizona Project, he added. The <br />document is scheduled to be filed with the Environmental Protection Agency in <br />February. <br /> <br />Plan 6 is the Bureau's proposed action for providing regulatory storage for CAP <br />water, and flood control for the Phoenix area. The plan is the result of nearly 5 <br />years of intensive study and public involvement effort conducted after Orme Dam, <br />originally authorized as part of the CAP, met with strong opposition from some <br />sectors of the public. <br /> <br />As proposed, Plan 6 included either a new or modified Roosevelt Dam, New Waddell <br />Dam on the Agua Fria River and Cliff Dam on the Verde River, and reconstruction work <br />on Stewart Mountain Dam on the Salt River. <br /> <br />"It was difficult to decide between the modification or new alternative," Plummer <br />said. <br /> <br />"We did an extensive analysis of 11 factors identified as being the most <br />relevant for comparing between the two options. <br /> <br />"The Salt River Project, which operates and maintains the dam, performed an <br />independent analysis of these same factors. Additionally, two private consultants <br />evaluated the technical adequacy and cost estimates of the Bureau's designs. <br /> <br />"In the Bureau's evaluations, the three most significant factors -- technical <br />feasibility, cost, and legislative requirements -- indicated that neither <br />alternative had a clear-cut advantage over the other. Both are feasible, cost about <br />the same, and required the same legislative actions before being built. <br /> <br />"A fourth factor -- public input -- then became a more significant element in <br />the decision. Public input, and the consultant's review, favored modifying the <br />existing structure over building a new one. Concerns expressed by the public and the <br />consultants considered the fact that the dam is a National Historic Landmark, and <br />that unknown problems and perhaps additional costs would be incurred if a new dam <br />was built. <br /> <br />-MORE- <br />